Skip to content

Kementerian Kemajuan Desa dan Wilayah

A development (P) vote: spending on this ministry's projects under the Twelfth Malaysia Plan (RMKe-12, 2021–2025). What each project was allocated and spent in 2024, from the audited Statement of Development Expenditure.

The same code is printed as Kementerian Kemajuan Luar Bandar dan Wilayah in 2016–2017 and Kementerian Pembangunan Luar Bandar in 2018–2022.

All development votes in 2024 · Operating vote B.22 · P.22 in Budget 2027

Estimate 2024Anggaran
RM 7.34 bn
Spent 2024Sebenar
RM 7.29 bn
99.3% of the estimate; RM 67.03 m loan-funded
Total cost of projectsKos Keseluruhan
RM 90.97 bn
RMKe-12 spent to dateSebenar RMKe-12
RM 26.89 bn
Totals as printed, JANM 2024, pp. 200–201

By group

The statement prints the vote's projects under these headings, each with its own total. Hover a figure for the exact amount, or open a group below for every project to the sen.

GroupEstimate 2024AnggaranSpent 2024Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
Kemajuan Masyarakat (KEMAS)RM 88.63 mRM 88.18 m
99.5%
RM 256.73 mJANM 2024, pp. 198–199
Majlis Amanah Rakyat (MARA)RM 2.52 bnRM 2.52 bn
100.0%
RM 9.30 bnJANM 2024, pp. 200–201
Bekalan Elektrik Luar BandarRM 157.14 mRM 153.15 m
97.5%
RM 949.84 mJANM 2024, pp. 200–201
Bekalan Air Luar BandarRM 165.75 mRM 151.57 m
91.5%
RM 933.09 mJANM 2024, pp. 200–201

Every project

Each project exactly as printed, to the sen, with the two-page spread it was read from.

Kemajuan Masyarakat (KEMAS)5 projectsEstimate RM 88.63 m · Spent RM 88.18 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2024AnggaranSpent 2024Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
00100Pendidikan KemahiranRM 126,608,810.00RM 19,267,707.00RM 19,245,312.82
99.9%
RM 64,254,357.78JANM 2024, pp. 198–199
00200Pembangunan KomunitiRM 42,000,000.00RM 10,400,000.00RM 10,399,797.20
100.0%
RM 29,019,682.25JANM 2024, pp. 198–199
00400Pendidikan Awal Kanak-kanakRM 205,784,268.00RM 28,538,181.00RM 28,347,083.73
99.3%
RM 67,687,236.46JANM 2024, pp. 198–199
00500Pusat Kegiatan MasyarakatRM 230,158,753.00RM 25,785,267.00RM 25,551,652.10
99.1%
RM 81,263,351.04JANM 2024, pp. 198–199
00600Latihan dan Pembangunan Profesional KEMASRM 81,390,743.00RM 4,638,817.00RM 4,638,792.00
100.0%
RM 14,508,150.84JANM 2024, pp. 198–199
Majlis Amanah Rakyat (MARA)14 projectsEstimate RM 2.52 bn · Spent RM 2.52 bn
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2024AnggaranSpent 2024Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
00601Pembangunan Sistem MARA (Multisectors)RM 31,338,000.00RM 0.00RM 0.00RM 9,200,200.00JANM 2024, pp. 198–199
00602Maktab Rendah Sains MARARM 1,133,305,392.00RM 102,319,900.00RM 102,319,900.00
100.0%
RM 290,699,500.00JANM 2024, pp. 198–199
00604Institut Kemahiran MARARM 589,883,679.00RM 91,832,700.00RM 91,832,700.00
100.0%
RM 303,888,900.00JANM 2024, pp. 198–199
00605Kolej Profesional MARARM 355,276,530.00RM 10,325,000.00RM 10,325,000.00
100.0%
RM 71,392,684.00JANM 2024, pp. 198–199
00606Kolej Poly-Tech MARARM 157,290,000.00RM 25,709,900.00RM 25,709,900.00
100.0%
RM 39,739,500.00JANM 2024, pp. 198–199
00607Perkhidmatan PengangkutanRM 201,245,480.00RM 8,450,000.00RM 8,450,000.00
100.0%
RM 33,250,100.00JANM 2024, pp. 198–199
00608Penilaian dan Kaunseling/Bimbingan UsahawanRM 301,865,148.00RM 28,970,000.00RM 28,970,000.00
100.0%
RM 99,770,300.00JANM 2024, pp. 198–199
00609Peningkatan Institusi Pendidikan MARARM 100,000,000.00RM 50,000,000.00RM 50,000,000.00
100.0%
RM 100,000,000.00JANM 2024, pp. 200–201
00611Program GIATMARARM 226,650,000.00RM 37,950,000.00RM 37,950,000.00
100.0%
RM 115,198,316.00JANM 2024, pp. 200–201
00614Bangunan PerniagaanRM 44,060,000.00RM 9,350,000.00RM 9,350,000.00
100.0%
RM 11,550,100.00JANM 2024, pp. 200–201
00615Pinjaman/Pembiayaan Secara IslamRM 1,040,000,000.00RM 90,000,000.00RM 90,000,000.00
100.0%
RM 355,000,000.00JANM 2024, pp. 200–201
00616UniKLRM 402,014,800.00RM 23,249,900.00RM 23,249,900.00
100.0%
RM 65,450,100.00JANM 2024, pp. 200–201
00618Institut Latihan Kecemerlangan MARA (ILHAM)RM 14,100,000.00RM 3,470,000.00RM 3,470,000.00
100.0%
RM 3,470,000.00JANM 2024, pp. 200–201
00620Program Penajaan Pendidikan MARARM 10,204,000,000.00RM 2,040,000,000.00RM 2,040,000,000.00
100.0%
RM 7,798,000,100.00JANM 2024, pp. 200–201
Bekalan Elektrik Luar Bandar4 projectsEstimate RM 157.14 m · Spent RM 153.15 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2024AnggaranSpent 2024Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
01701Bekalan Elektrik Luar Bandar SemenanjungRM 77,500,100.00RM 6,171,790.00RM 4,502,569.00
73.0%
RM 51,038,114.64JANM 2024, pp. 200–201
01702Bekalan Elektrik Luar Bandar SarawakRM 4,152,983,448.00RM 14,648,850.00RM 14,469,890.10
98.8%
RM 267,002,926.50JANM 2024, pp. 200–201
01703Bekalan Elektrik Luar Bandar SabahRM 4,524,316,526.00RM 99,821,360.00RM 97,678,611.65
97.8%
RM 437,477,897.36JANM 2024, pp. 200–201
01707Pemasangan Baru Lampu Jalan KampungRM 421,392,600.00RM 36,500,000.00RM 36,500,000.00
100.0%
RM 194,321,371.01JANM 2024, pp. 200–201
Bekalan Air Luar Bandar4 projectsEstimate RM 165.75 m · Spent RM 151.57 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2024AnggaranSpent 2024Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
02001Bekalan Air Luar Bandar SemenanjungRM 1,651,749,000.00RM 48,019,929.00RM 45,910,326.79
95.6%
RM 211,066,601.11JANM 2024, pp. 200–201
02002Bekalan Air Luar Bandar SarawakRM 3,156,318,360.00RM 37,900,000.00RM 28,673,417.86
75.7%
RM 277,336,690.09JANM 2024, pp. 200–201
02003Bekalan Air Luar Bandar SabahRM 3,932,656,640.00RM 69,860,000.00RM 68,393,143.43
97.9%
RM 400,718,215.64JANM 2024, pp. 200–201
02004Bekalan Air AlternatifRM 77,400,000.00RM 9,970,000.00RM 8,597,710.20
86.2%
RM 43,964,660.52JANM 2024, pp. 200–201
Projects printed without a group subtotal32 projects

These projects count toward the vote total but are not printed under a group heading.

CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2024AnggaranSpent 2024Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
00700(PPP/PFI)RM 190,000,000.00RM 38,000,000.00RM 37,907,681.76
99.8%
RM 151,630,727.04JANM 2024, pp. 200–201
00800Teknologi Maklumat (ICT)RM 28,500,000.00RM 6,428,900.00RM 6,428,839.09
100.0%
RM 26,146,383.14JANM 2024, pp. 200–201
00900Institut Kemajuan Desa (INFRA)RM 135,496,651.00RM 15,089,872.00RM 14,185,226.96
94.0%
RM 32,748,779.58JANM 2024, pp. 200–201
01100Jabatan Kemajuan Orang Asli (JAKOA)RM 2,416,063,566.00RM 143,460,372.00RM 136,567,513.71
95.2%
RM 412,177,729.42JANM 2024, pp. 200–201
02200Jambatan Luar BandarRM 758,067,115.00RM 45,320,094.00RM 40,939,282.11
90.3%
RM 65,746,935.08JANM 2024, pp. 200–201
02300Jalan-jalan Luar BandarRM 35,106,895,614.00RM 2,020,993,279.00RM 2,003,652,240.36
99.1%
RM 5,631,994,173.83JANM 2024, pp. 200–201
02400Jalan Perhubungan DesaRM 1,788,630,000.00RM 310,964,000.00RM 310,261,013.05
99.8%
RM 1,498,288,631.18JANM 2024, pp. 200–201
02401Ameniti SosialRM 369,100,000.00RM 73,639,500.00RM 73,073,759.43
99.2%
RM 320,042,240.29JANM 2024, pp. 200–201
02402Pengupayaan Komuniti dan InfodesaRM 24,000,000.00RM 9,500,000.00RM 9,435,336.80
99.3%
RM 23,362,197.22JANM 2024, pp. 200–201
02403Program Bersepadu Pemajuan KawasanRM 806,188,181.00RM 37,080,000.00RM 37,079,800.00
100.0%
RM 91,643,402.99JANM 2024, pp. 200–201
02404Program Lonjakan Mega Luar BandarRM 229,500,000.00RM 22,000,000.00RM 22,000,000.00
100.0%
RM 91,220,200.00JANM 2024, pp. 200–201
02407Kawal Selia Lembaga Kemajuan WilayahRM 120,000,000.00RM 25,000,000.00RM 25,000,000.00
100.0%
RM 49,000,000.00JANM 2024, pp. 200–201
02503Pembangunan Ekonomi Luar BandarRM 129,500,000.00RM 18,000,000.00RM 17,999,990.00
100.0%
RM 57,255,283.15JANM 2024, pp. 200–201
02600Pembangunan Ekonomi KomunitiRM 265,000,000.00RM 19,000,000.00RM 18,995,499.00
100.0%
RM 61,586,457.00JANM 2024, pp. 200–201
03100Lembaga Pemulihan dan Penyatuan Tanah (FELCRA)RM 4,831,399,294.00RM 440,120,700.00RM 440,120,700.00
100.0%
RM 1,930,180,672.00JANM 2024, pp. 200–201
03200Skim Pembangunan Kesejahteraan RakyatRM 2,229,002,800.00RM 497,200,000.00RM 497,181,211.05
100.0%
RM 1,661,404,311.79JANM 2024, pp. 200–201
03700Lembaga Kemajuan Johor Tenggara (KEJORA)RM 396,770,000.00RM 25,500,000.00RM 25,500,000.00
100.0%
RM 109,310,000.00JANM 2024, pp. 200–201
03800Lembaga Kemajuan Terengganu Tengah (KETENGAH)RM 349,065,500.00RM 45,952,100.00RM 45,952,008.00
100.0%
RM 161,181,508.00JANM 2024, pp. 200–201
03900Lembaga Kemajuan Kelantan Selatan (KESEDAR)RM 635,871,038.00RM 25,034,600.00RM 25,034,563.00
100.0%
RM 141,802,363.00JANM 2024, pp. 200–201
04000Pihak Berkuasa Kemajuan Pekebun Kecil Perusahaan Getah (RISDA)RM 3,709,808,800.00RM 325,415,600.00RM 325,415,527.00
100.0%
RM 1,992,727,131.00JANM 2024, pp. 200–201
04100Lembaga Kemajuan Wilayah Kedah (KEDA)RM 360,879,599.00RM 37,940,800.00RM 37,940,781.00
100.0%
RM 177,278,731.00JANM 2024, pp. 200–201
04200Lembaga Kemajuan Wilayah Pulau Pinang (PERDA)RM 214,847,569.00RM 30,994,800.00RM 30,994,800.00
100.0%
RM 110,424,700.00JANM 2024, pp. 200–201
04500Lembaga Industri Getah Sabah (LIGS)RM 771,031,979.00RM 77,134,600.00RM 77,134,600.00
100.0%
RM 303,634,600.00JANM 2024, pp. 200–201
04800Jabatan Pertanian Sarawak (JPS)RM 638,876,900.00RM 13,383,382.00RM 13,288,627.04
99.3%
RM 70,148,358.77JANM 2024, pp. 200–201
05000Lembaga Kemajuan Tanah Sabah (SLDB)RM 347,510,703.00RM 31,300,000.00RM 31,300,000.00
100.0%
RM 136,107,136.00JANM 2024, pp. 200–201
06000Lembaga Kemajuan Tanah Sarawak (LKTS)RM 29,678,900.00RM 2,800,000.00RM 2,800,000.00
100.0%
RM 7,800,000.00JANM 2024, pp. 200–201
07000Lembaga Kemajuan Bintulu (BDA)RM 26,025,000.00RM 2,350,000.00RM 2,350,000.00
100.0%
RM 13,625,000.00JANM 2024, pp. 200–201
08000Lembaga Pemulihan dan Penyatuan Tanah Sarawak (SALCRA)RM 474,523,500.00RM 35,500,000.00RM 35,500,000.00
100.0%
RM 87,065,875.00JANM 2024, pp. 200–201
09000Lembaga Kemajuan Perusahaan Pertanian Negeri Pahang (LKPP)RM 7,000,000.00RM 1,750,000.00RM 1,750,000.00
100.0%
RM 6,250,000.00JANM 2024, pp. 200–201
10000Perbadanan Pembangunan Pertanian Negeri PerakRM 5,600,000.00RM 900,000.00RM 900,000.00
100.0%
RM 3,200,000.00JANM 2024, pp. 200–201
11000Perbadanan Kemajuan Pertanian Selangor (PKPS)RM 65,100,000.00RM 12,649,000.00RM 12,649,000.00
100.0%
RM 13,999,000.00JANM 2024, pp. 200–201
95000Program Pembangunan TVETRM 24,623,700.00RM 13,425,200.00RM 13,425,198.10
100.0%
RM 13,425,198.10JANM 2024, pp. 200–201

Source: Jabatan Akauntan Negara, Penyata Kewangan Kerajaan Persekutuan 2024, Statement of Development Expenditure (Lampiran 2).