A development (P) vote: spending on this ministry's projects under the Twelfth Malaysia Plan (RMKe-12, 2021–2025). What each project was allocated and spent in 2023, from the audited Statement of Development Expenditure.

The same code is printed as Kementerian Pertanian dan Industri Asas Tani in 2016–2019 and Kementerian Pertanian dan Industri Makanan in 2020–2022.

All development votes in 2023 · Operating vote B.21 · P.21 in Budget 2027

Estimate 2023Anggaran
RM 1.45 bn
Spent 2023Sebenar
RM 1.42 bn
97.7% of the estimate; RM 164.00 m loan-funded
Total cost of projectsKos Keseluruhan
RM 12.74 bn
RMKe-12 spent to dateSebenar RMKe-12
RM 4.07 bn
Totals as printed, JANM 2023, pp. 190–191

By group

The statement prints the vote's projects under these headings, each with its own total. Hover a figure for the exact amount, or open a group below for every project to the sen.

GroupEstimate 2023AnggaranSpent 2023Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
Ibu PejabatRM 180.35 mRM 172.27 m
95.5%
RM 761.09 mJANM 2023, pp. 188–189
PertanianRM 1.06 mRM 1.06 m
100.0%
RM 22.06 mJANM 2023, pp. 188–189
Perkhidmatan VeterinarRM 1.80 mRM 1.49 m
83.0%
RM 10.98 mJANM 2023, pp. 188–189
PerikananRM 5.00 mRM 5.00 m
100.0%
RM 13.45 mJANM 2023, pp. 188–189

Every project

Each project exactly as printed, to the sen, with the two-page spread it was read from.

Ibu Pejabat21 projectsEstimate RM 180.35 m · Spent RM 172.27 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2023AnggaranSpent 2023Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
00100Lembaga Pemasaran Pertanian Persekutuan (FAMA)RM 100,000,000.00RM 11,775,000.00RM 11,775,000.00
100.0%
RM 32,995,000.00JANM 2023, pp. 188–189
00500Lembaga Kemajuan Ikan Malaysia (LKIM)RM 205,640,000.00RM 0.00RM 0.00RM 78,960,200.00JANM 2023, pp. 188–189
00600Lembaga Kemajuan Pertanian Kemubu (KADA)RM 39,859,280.00RM 500,000.00RM 500,000.00
100.0%
RM 14,500,000.00JANM 2023, pp. 188–189
01300IADA KerianRM 25,000,000.00RM 0.00RM 0.00RM 746,825.00JANM 2023, pp. 188–189
01700IADA Kalaka SaribasRM 36,986,000.00RM 0.00RM 0.00RM 1,976,077.50JANM 2023, pp. 188–189
01910IADA PekanRM 226,762,000.00RM 2,456,400.00RM 2,454,180.38
99.9%
RM 25,987,282.85JANM 2023, pp. 188–189
01920IADA RompinRM 57,100,000.00RM 158,700.00RM 158,230.77
99.7%
RM 1,284,261.84JANM 2023, pp. 188–189
01930IADA Kota BeludRM 185,300,000.00RM 23,144,700.00RM 22,123,570.48
95.6%
RM 38,955,547.92JANM 2023, pp. 188–189
01940IADA Batang LuparRM 204,600,000.00RM 4,217,900.00RM 4,182,158.19
99.2%
RM 41,491,190.80JANM 2023, pp. 188–189
12800Pemodenan Sistem Pengairan PadiRM 738,240,400.00RM 32,140,181.00RM 31,367,983.65
97.6%
RM 165,668,480.93JANM 2023, pp. 188–189
12900Program Pembangunan Punca AirRM 1,053,600,000.00RM 21,944,100.00RM 21,846,965.68
99.6%
RM 64,434,058.23JANM 2023, pp. 188–189
14700Program Pembangunan Zon Pantai Untuk Kawasan Tanaman/Perikanan Pelbagai NegeriRM 49,200,000.00RM 233,300.00RM 233,147.11
99.9%
RM 37,655,048.79JANM 2023, pp. 188–189
14800Pembinaan dan Pembaikan Jalan LadangRM 128,000,000.00RM 31,000,000.00RM 30,999,255.43
100.0%
RM 63,032,334.83JANM 2023, pp. 188–189
15400Rancangan Pembangunan Sistem Saliran PertanianRM 40,000,000.00RM 3,205,600.00RM 3,157,892.71
98.5%
RM 12,157,299.01JANM 2023, pp. 188–189
15600Program Kawalan Banjir Kawasan PertanianRM 16,700,000.00RM 350,200.00RM 350,175.20
100.0%
RM 12,507,556.58JANM 2023, pp. 188–189
16600Rancangan-rancangan Pengairan SabahRM 40,600,000.00RM 3,467,319.00RM 3,467,318.39
100.0%
RM 30,191,179.16JANM 2023, pp. 188–189
90100Dasar Perancangan StrategikRM 7,000,000.00RM 2,000,000.00RM 1,996,775.00
99.8%
RM 6,324,699.31JANM 2023, pp. 188–189
90200Industri Tanaman, Ternakan dan PerikananRM 265,307,400.00RM 37,000,000.00RM 30,919,379.09
83.6%
RM 110,839,479.90JANM 2023, pp. 188–189
90400Industri Padi dan BerasRM 21,031,000.00RM 100.00RM 0.00
0.0%
RM 6,700,000.00JANM 2023, pp. 188–189
90700Latihan Pertanian KebangsaanRM 35,000,000.00RM 6,754,800.00RM 6,738,259.91
99.8%
RM 12,385,084.85JANM 2023, pp. 188–189
90900Industri Asas Tani (IAT)RM 3,000,000.00RM 0.00RM 0.00RM 2,297,454.10JANM 2023, pp. 188–189
Pertanian10 projectsEstimate RM 1.06 m · Spent RM 1.06 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2023AnggaranSpent 2023Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
02000Program Pembangunan Komoditi TanamanRM 18,390,500.00RM 0.00RM 0.00RM 3,220,000.00JANM 2023, pp. 188–189
02400Menaik Taraf Kemudahan Makmal Kimia PertanianRM 2,800,000.00RM 0.00RM 0.00RM 1,130,000.00JANM 2023, pp. 188–189
03300Kompleks PertanianRM 28,845,000.00RM 0.00RM 0.00RM 1,505,883.51JANM 2023, pp. 188–189
03700Khidmat Sokongan TeknikalRM 10,000,000.00RM 0.00RM 0.00RM 59,152.50JANM 2023, pp. 188–189
04000Pembangunan Mempelbagai PertanianRM 20,000,000.00RM 629,100.00RM 629,027.97
100.0%
RM 9,571,197.51JANM 2023, pp. 188–189
04700Pembangunan Industri Padi SarawakRM 15,000,000.00RM 426,100.00RM 426,045.40
100.0%
RM 1,804,263.80JANM 2023, pp. 188–189
04900Pembangunan Industri Buah-buahanRM 25,000,000.00RM 0.00RM 0.00RM 1,014,476.54JANM 2023, pp. 188–189
05100Kuarantin Tumbuhan SarawakRM 5,000,000.00RM 100.00RM 0.00
0.0%
RM 9,689.18JANM 2023, pp. 188–189
12500Pembangunan Industri Tanaman MakananRM 152,000,000.00RM 0.00RM 0.00RM 230,000.00JANM 2023, pp. 188–189
41000Perkhidmatan Kuarantin dan Pemeriksaan Malaysia (MAQIS) - RMKe11RM 15,277,892.00RM 300.00RM 0.00
0.0%
RM 3,513,459.44JANM 2023, pp. 188–189
Perkhidmatan Veterinar5 projectsEstimate RM 1.80 m · Spent RM 1.49 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2023AnggaranSpent 2023Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
10710Pembangunan Industri Lembu/Kerbau PedagingRM 43,876,400.00RM 856,600.00RM 657,836.66
76.8%
RM 2,438,439.83JANM 2023, pp. 188–189
10730Pembangunan Industri TenusuRM 16,400,000.00RM 940,000.00RM 833,487.63
88.7%
RM 2,836,997.17JANM 2023, pp. 188–189
22300Kawasan Penternakan BabiRM 26,104,000.00RM 138.00RM 0.00
0.0%
RM 12,000.00JANM 2023, pp. 188–189
22500Projek Lembu PedagingRM 9,904,000.00RM 100.00RM 0.00
0.0%
RM 10,000.00JANM 2023, pp. 188–189
41800Jabatan Perkhidmatan Haiwan dan Perusahaan TernakRM 31,686,000.00RM 200.00RM 0.00
0.0%
RM 5,685,000.00JANM 2023, pp. 188–189
Perikanan3 projectsEstimate RM 5.00 m · Spent RM 5.00 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2023AnggaranSpent 2023Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
17100Taman LautRM 37,130,000.00RM 2,000,000.00RM 1,999,994.87
100.0%
RM 7,500,572.10JANM 2023, pp. 188–189
23300Pengurusan dan Pemulihan IkanRM 23,515,000.00RM 3,000,000.00RM 3,000,000.00
100.0%
RM 5,450,000.00JANM 2023, pp. 188–189
23500Pengembangan dan DidikanRM 13,930,000.00RM 0.00RM 0.00RM 499,607.99JANM 2023, pp. 188–189
Projects printed without a group subtotal48 projects

These projects count toward the vote total but are not printed under a group heading.

CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2023AnggaranSpent 2023Sebenar% usedPrestasiRMKe-12 to dateSebenar RMKe-12SourceSumber
10001Bahagian Dasar dan Perancangan StrategikRM 10,000,000.00RM 1,589,700.00RM 1,589,601.65
100.0%
RM 8,631,601.65JANM 2023, pp. 188–189
10002Bahagian PembangunanRM 400,000,000.00RM 57,674,200.00RM 57,661,031.21
100.0%
RM 138,244,716.42JANM 2023, pp. 188–189
10003Bahagian Sekuriti MakananRM 100,000,000.00RM 100,000,000.00RM 95,596,597.17
95.6%
RM 98,796,597.17JANM 2023, pp. 188–189
10004Bahagian Industri Makanan dan Asas TaniRM 176,250,000.00RM 25,561,100.00RM 21,680,558.09
84.8%
RM 60,295,605.14JANM 2023, pp. 188–189
10005Bahagian Pembangunan Perniagaan dan Pelaburan (Pemasaran dan Eksport)RM 36,500,000.00RM 13,760,000.00RM 13,755,754.68
100.0%
RM 27,935,424.41JANM 2023, pp. 190–191
10006Bahagian Pembangunan Perniagaan dan Pelaburan (Pelaburan)RM 51,850,000.00RM 14,500,000.00RM 14,492,913.91
100.0%
RM 15,562,913.91JANM 2023, pp. 190–191
10007Bahagian Pembangunan Kapasiti dan Latihan PertanianRM 86,240,000.00RM 14,343,200.00RM 12,234,787.78
85.3%
RM 25,585,531.44JANM 2023, pp. 190–191
10008Unit Agroprenuer MudaRM 100,000,000.00RM 20,000,000.00RM 19,851,381.95
99.3%
RM 54,056,592.60JANM 2023, pp. 190–191
10009Bahagian Pengurusan MaklumatRM 2,500,000.00RM 428,300.00RM 428,280.00
100.0%
RM 1,527,535.11JANM 2023, pp. 190–191
10010Bahagian KewanganRM 325,000,000.00RM 0.00RM 0.00RM 122,911,457.76JANM 2023, pp. 190–191
10012Bahagian Pembangunan Industri PadiRM 5,000,000.00RM 1,000,000.00RM 999,888.10
100.0%
RM 2,494,671.04JANM 2023, pp. 190–191
10013Bahagian Pengairan dan Saliran PertanianRM 126,250,000.00RM 8,147,800.00RM 8,032,783.15
98.6%
RM 10,715,513.64JANM 2023, pp. 190–191
10015Bahagian Pemodenan PertanianRM 31,741,000.00RM 9,574,669.00RM 9,520,056.80
99.4%
RM 9,686,387.60JANM 2023, pp. 190–191
20001IADA - Barat Laut SelangorRM 22,900,000.00RM 4,999,200.00RM 4,999,125.90
100.0%
RM 11,248,313.49JANM 2023, pp. 190–191
20002IADA - Seberang PerakRM 23,000,000.00RM 5,000,000.00RM 4,999,985.27
100.0%
RM 10,699,678.37JANM 2023, pp. 190–191
20003IADA - KerianRM 14,500,000.00RM 1,800,000.00RM 1,799,872.28
100.0%
RM 9,793,286.68JANM 2023, pp. 190–191
20004IADA - Kemasin SemerakRM 21,900,000.00RM 1,843,000.00RM 1,842,819.88
100.0%
RM 4,898,269.18JANM 2023, pp. 190–191
20005IADA - KETARARM 11,200,000.00RM 1,340,000.00RM 1,339,984.52
100.0%
RM 6,249,931.89JANM 2023, pp. 190–191
20006IADA - Pulau PinangRM 22,100,000.00RM 6,600,000.00RM 6,599,904.02
100.0%
RM 13,823,296.02JANM 2023, pp. 190–191
20007IADA - Kalaka Saribas BetongRM 28,150,000.00RM 7,543,400.00RM 7,437,285.20
98.6%
RM 18,347,130.29JANM 2023, pp. 190–191
20008IADA - SamarahanRM 26,750,000.00RM 6,350,000.00RM 6,349,891.50
100.0%
RM 20,449,311.60JANM 2023, pp. 190–191
20009IADA - PekanRM 12,500,000.00RM 1,800,000.00RM 1,799,993.80
100.0%
RM 9,299,993.80JANM 2023, pp. 190–191
20010IADA - RompinRM 16,000,000.00RM 3,000,000.00RM 2,999,953.30
100.0%
RM 9,499,281.03JANM 2023, pp. 190–191
20011IADA - Kota BeludRM 11,600,000.00RM 2,700,000.00RM 2,699,103.05
100.0%
RM 8,583,922.46JANM 2023, pp. 190–191
20012IADA - Batang LuparRM 7,800,000.00RM 1,600,000.00RM 1,599,883.14
100.0%
RM 4,376,754.64JANM 2023, pp. 190–191
24000Kemudahan Lampu Pemandu dan Penambatan VeselRM 8,370,000.00RM 0.00RM 0.00RM 184,520.00JANM 2023, pp. 190–191
30001Jabatan Pertanian Malaysia (DOA)RM 344,500,000.00RM 80,780,000.00RM 80,118,452.97
99.2%
RM 203,092,933.11JANM 2023, pp. 190–191
30002Jabatan Pertanian SabahRM 146,500,000.00RM 28,473,410.00RM 28,473,114.78
100.0%
RM 51,813,114.78JANM 2023, pp. 190–191
30003Jabatan Pertanian SarawakRM 109,650,000.00RM 20,813,200.00RM 20,382,824.20
97.9%
RM 41,551,869.18JANM 2023, pp. 190–191
30004Jabatan Perikanan Malaysia (DOF)RM 422,090,000.00RM 67,681,500.00RM 67,649,370.56
100.0%
RM 155,635,722.87JANM 2023, pp. 190–191
30005Jabatan Perikanan SabahRM 59,800,000.00RM 12,300,000.00RM 12,299,549.60
100.0%
RM 23,746,312.87JANM 2023, pp. 190–191
30006Jabatan Perikanan Laut SarawakRM 97,275,000.00RM 19,341,000.00RM 18,788,914.96
97.2%
RM 43,029,551.46JANM 2023, pp. 190–191
30007Jabatan Perkhidmatan Veterinar Malaysia (DVS)RM 232,178,000.00RM 28,977,731.00RM 28,231,975.14
97.4%
RM 68,571,646.64JANM 2023, pp. 190–191
30008Jabatan Perkhidmatan Veterinar SabahRM 55,440,520.00RM 19,314,362.00RM 19,314,261.66
100.0%
RM 19,329,261.66JANM 2023, pp. 190–191
30009Jabatan Perkhidmatan Veterinar SarawakRM 52,500,000.00RM 5,016,903.00RM 4,016,503.00
80.1%
RM 19,996,472.00JANM 2023, pp. 190–191
30010Jabatan Perkhidmatan Kuarantin dan Pemeriksaan Malaysia (MAQIS)RM 150,500,000.00RM 6,623,687.00RM 6,589,785.98
99.5%
RM 10,850,076.27JANM 2023, pp. 190–191
40001Institut Penyelidikan dan Kemajuan Pertanian Malaysia (MARDI)RM 158,500,000.00RM 33,700,000.00RM 33,700,000.00
100.0%
RM 87,350,000.00JANM 2023, pp. 190–191
40002Lembaga Pemasaran Pertanian Persekutuan (FAMA)RM 193,380,000.00RM 74,610,000.00RM 74,610,000.00
100.0%
RM 121,850,000.00JANM 2023, pp. 190–191
40003Lembaga Pertubuhan Peladang (LPP)RM 311,272,250.00RM 74,104,000.00RM 74,104,000.00
100.0%
RM 175,339,000.00JANM 2023, pp. 190–191
40004Lembaga Perindustrian Nanas Malaysia (LPNM)RM 137,000,000.00RM 24,000,000.00RM 24,000,000.00
100.0%
RM 50,925,000.00JANM 2023, pp. 190–191
40005Lembaga Kemajuan Ikan Malaysia (LKIM)RM 339,500,000.00RM 28,976,100.00RM 28,976,039.00
100.0%
RM 77,276,139.00JANM 2023, pp. 190–191
40006Lembaga Kemajuan Pertanian Kemubu (KADA)RM 96,000,000.00RM 8,550,000.00RM 8,550,000.00
100.0%
RM 25,064,000.00JANM 2023, pp. 190–191
40007Lembaga Kemajuan Pertanian Muda ((MADA)RM 175,138,000.00RM 30,500,000.00RM 30,500,000.00
100.0%
RM 63,235,000.00JANM 2023, pp. 190–191
40008Agro BankRM 500,000,000.00RM 150,000,000.00RM 150,000,000.00
100.0%
RM 410,000,000.00JANM 2023, pp. 190–191
40009Malaysian Bioeconomy Development CorporationRM 85,000,000.00RM 0.00RM 0.00RM 9,000,000.00JANM 2023, pp. 190–191
51000Dana Jaminan MakananNote: P.21 – Butiran 51000 - Peruntukan sebanyak RM10 akan dibentangkan dalam Sesi Parlimen 2024 telah dimasuk kira sebagai pendahuluanRM 540,000,000.00RM 7,861,510.00RM 7,793,166.93
99.1%
RM 505,060,405.69JANM 2023, pp. 190–191
94000Projek Pemacu PertanianRM 2,351,349,834.00RM 132,350,000.00RM 121,270,531.30
91.6%
RM 291,475,529.88JANM 2023, pp. 190–191
95000Private Public Partnership/Private Finance (PPP/PFI)RM 530,640,000.00RM 99,342,800.00RM 99,342,728.88
100.0%
RM 99,342,728.88JANM 2023, pp. 190–191

Source: Jabatan Akauntan Negara, Penyata Kewangan Kerajaan Persekutuan 2023, Statement of Development Expenditure (Lampiran 2).