Skip to content

Kementerian Pertanian dan Industri Asas Tani

A development (P) vote: spending on this ministry's projects under the Eleventh Malaysia Plan (RMKe-11, 2016–2020). What each project was allocated and spent in 2018, from the audited Statement of Development Expenditure.

The same code is printed as Kementerian Pertanian dan Industri Makanan in 2020–2022 and Kementerian Pertanian dan Keterjaminan Makanan in 2023–2025.

All development votes in 2018 · Operating vote B.21 · P.21 in Budget 2027

Estimate 2018Anggaran
RM 1.25 bn
Spent 2018Sebenar
RM 1.19 bn
95.4% of the estimate; RM 50.00 m loan-funded
Total cost of projectsKos Keseluruhan
RM 17.85 bn
RMKe-11 spent to dateSebenar RMKe-11
RM 3.94 bn
Totals as printed, JANM 2018, pp. 214–215

By group

The statement prints the vote's projects under these headings, each with its own total. Hover a figure for the exact amount, or open a group below for every project to the sen.

GroupEstimate 2018AnggaranSpent 2018Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
Ibu PejabatRM 750.43 mRM 709.90 m
94.6%
RM 2.08 bnJANM 2018, pp. 212–213
PertanianRM 85.75 mRM 76.63 m
89.4%
RM 246.15 mJANM 2018, pp. 212–213
Perkhidmatan VeterinarRM 60.43 mRM 57.07 m
94.4%
RM 166.33 mJANM 2018, pp. 212–213
PerikananRM 63.46 mRM 60.59 m
95.5%
RM 181.88 mJANM 2018, pp. 214–215

Every project

Each project exactly as printed, to the sen, with the two-page spread it was read from.

Ibu Pejabat39 projectsEstimate RM 750.43 m · Spent RM 709.90 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2018AnggaranSpent 2018Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
00100Lembaga Pemasaran Pertanian Persekutuan (FAMA)RM 280,900,000.00RM 22,805,000.00RM 22,805,000.00
100.0%
RM 134,483,099.00JANM 2018, pp. 210–211
00203Bank Pertanian Malaysia (BPM)RM 500,000,000.00RM 50,000,000.00RM 50,000,000.00
100.0%
RM 135,000,000.00JANM 2018, pp. 210–211
00300Institut Penyelidikan dan Kemajuan Pertanian Malaysia (MARDI)RM 221,525,694.00RM 41,861,500.00RM 41,861,500.00
100.0%
RM 121,293,100.00JANM 2018, pp. 210–211
00400Lembaga Perindustrian Nanas Malaysia (LPNM)RM 104,250,000.00RM 12,000,000.00RM 12,000,000.00
100.0%
RM 51,961,700.00JANM 2018, pp. 210–211
00500Lembaga Kemajuan Ikan Malaysia (LKIM)RM 851,336,000.00RM 71,146,006.00RM 71,146,006.00
100.0%
RM 151,941,768.00JANM 2018, pp. 210–211
00600Lembaga Kemajuan Pertanian Kemubu (KADA)RM 166,154,000.00RM 42,384,720.00RM 42,384,720.00
100.0%
RM 97,224,720.00JANM 2018, pp. 210–211
00700Lembaga Pertubuhan Peladang (LPP)RM 161,146,251.00RM 36,035,000.00RM 36,035,000.00
100.0%
RM 98,285,000.00JANM 2018, pp. 210–211
00800Lembaga Kemajuan Pertanian Muda (MADA)RM 95,690,000.00RM 10,415,000.00RM 9,111,250.00
87.5%
RM 36,233,750.00JANM 2018, pp. 210–211
00900Projek Pertanian yang LainRM 292,422,714.00RM 7,693,280.00RM 7,691,976.49
100.0%
RM 68,489,966.59JANM 2018, pp. 210–211
00901Agropreneur MudaRM 100,000,000.00RM 15,000,000.00RM 15,000,000.00
100.0%
RM 15,000,000.00JANM 2018, pp. 210–211
00903Pemasaran dan EksportRM 53,000,000.00RM 11,000,000.00RM 10,467,416.56
95.2%
RM 10,467,416.56JANM 2018, pp. 210–211
01100Projek Pertanian Bersepadu Barat Laut SelangorRM 10,500,000.00RM 1,000,000.00RM 999,987.44
100.0%
RM 5,607,919.53JANM 2018, pp. 210–211
01200Projek Pertanian Seberang PerakRM 10,750,000.00RM 2,300,000.00RM 2,174,558.64
94.5%
RM 6,479,429.67JANM 2018, pp. 210–211
01300Projek Pertanian Bersepadu Krian/Sg. ManikRM 33,000,000.00RM 4,680,000.00RM 3,644,240.77
77.9%
RM 17,346,355.69JANM 2018, pp. 210–211
01400IADA Kemasin SemerakRM 9,725,000.00RM 1,925,000.00RM 1,617,418.17
84.0%
RM 5,474,096.10JANM 2018, pp. 210–211
01500Projek Pertanian Bersepadu Terengganu UtaraRM 8,500,000.00RM 1,700,000.00RM 1,699,686.55
100.0%
RM 5,089,341.41JANM 2018, pp. 210–211
01600IADA Pulau PinangRM 30,500,000.00RM 4,500,000.00RM 4,374,690.54
97.2%
RM 17,795,412.91JANM 2018, pp. 210–211
01700IADA Kalaka SaribasRM 54,700,000.00RM 8,000,000.00RM 7,998,287.03
100.0%
RM 21,244,645.18JANM 2018, pp. 210–211
01800IADA SamarahanRM 28,750,000.00RM 5,150,000.00RM 5,052,895.69
98.1%
RM 19,039,896.56JANM 2018, pp. 212–213
01910IADA PekanRM 292,520,000.00RM 17,652,370.00RM 8,374,240.42
47.4%
RM 45,698,233.15JANM 2018, pp. 212–213
01920IADA RompinRM 145,775,000.00RM 10,350,000.00RM 9,121,111.46
88.1%
RM 34,433,217.87JANM 2018, pp. 212–213
01930IADA Kota BelutRM 357,100,000.00RM 54,740,922.00RM 53,647,704.81
98.0%
RM 129,290,761.40JANM 2018, pp. 212–213
01940IADA Batang LuparRM 502,100,000.00RM 14,434,000.00RM 12,851,234.70
89.0%
RM 115,926,688.64JANM 2018, pp. 212–213
12700Projek Empangan Paya Peda, TerengganuRM 424,700,000.00RM 0.00RM 0.00RM 5,887,102.13JANM 2018, pp. 212–213
12800Pemodenan Sistem Pengairan PadiRM 1,245,323,374.00RM 101,093,111.00RM 90,751,236.14
89.8%
RM 283,833,785.44JANM 2018, pp. 212–213
12900Program Pembangunan Punca AirRM 1,145,306,905.00RM 49,526,197.00RM 44,915,482.36
90.7%
RM 94,715,015.55JANM 2018, pp. 212–213
14700Program Pembangunan Zon Pantai Untuk Kawasan Tanaman/Perikanan Pelbagai NegeriRM 122,700,000.00RM 3,090,100.00RM 2,896,673.76
93.7%
RM 13,500,133.13JANM 2018, pp. 212–213
14800Pembinaan dan Pembaikan Jalan LadangRM 156,956,000.00RM 8,000,000.00RM 7,992,164.32
99.9%
RM 39,003,935.87JANM 2018, pp. 212–213
15400Rancangan Pembangunan Sistem Saliran PertanianRM 93,000,000.00RM 6,122,600.00RM 5,925,100.91
96.8%
RM 33,682,862.25JANM 2018, pp. 212–213
15600Program Kawalan Banjir Kawasan PertanianRM 51,240,000.00RM 4,423,000.00RM 3,087,810.50
69.8%
RM 16,905,179.93JANM 2018, pp. 212–213
15700Rancangan-rancangan Pengairan, Sarawak sRM 37,600,000.00RM 600,000.00RM 600,000.00
100.0%
RM 7,537,365.08JANM 2018, pp. 212–213
15800Rancangan-rancangan Saliran, Sarawak sRM 6,400,000.00RM 0.00RM 0.00RM 784,676.24JANM 2018, pp. 212–213
16600Rancangan-rancangan Pengairan, Sabah sRM 38,000,000.00RM 2,850,000.00RM 21,297.32
0.8%
RM 2,560,267.77JANM 2018, pp. 212–213
90100Dasar Perancangan Strategik (DPS)RM 833,531,876.00RM 66,143,100.00RM 64,282,336.74
97.2%
RM 72,071,487.44JANM 2018, pp. 212–213
90200Industri Tanaman, Ternakan dan Perikanan (ITTP)RM 447,457,400.00RM 35,600,000.00RM 34,639,937.11
97.3%
RM 45,818,299.67JANM 2018, pp. 212–213
90300Perkhidmatan Industri dan Ekonomi Bumiputera (PIEB)RM 95,629,955.00RM 0.00RM 0.00RM 95,629,954.20JANM 2018, pp. 212–213
90700Majlis Latihan Pertanian Kebangsaan (NATC)RM 103,924,262.00RM 11,245,949.00RM 10,446,652.20
92.9%
RM 11,876,813.20JANM 2018, pp. 212–213
90800Pengurusan Maklumat (BPM)RM 2,430,000.00RM 960,000.00RM 924,729.00
96.3%
RM 1,044,002.00JANM 2018, pp. 212–213
90900Industri Asas Tani (IAT)RM 160,000,000.00RM 14,000,000.00RM 13,357,559.32
95.4%
RM 13,413,839.32JANM 2018, pp. 212–213
Pertanian14 projectsEstimate RM 85.75 m · Spent RM 76.63 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2018AnggaranSpent 2018Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
02000Program Pembangunan Komoditi TanamanRM 77,331,500.00RM 19,101,000.00RM 19,101,000.00
100.0%
RM 38,212,024.84JANM 2018, pp. 212–213
02100Program PenyelidikanRM 2,750,000.00RM 800,000.00RM 800,000.00
100.0%
RM 2,050,000.00JANM 2018, pp. 212–213
02200Perkhidmatan Pengembangan PertanianRM 8,000,000.00RM 2,000,000.00RM 2,000,000.00
100.0%
RM 5,135,476.23JANM 2018, pp. 212–213
02300Program LatihanRM 4,464,858.00RM 0.00RM 0.00RM 4,464,857.79JANM 2018, pp. 212–213
03300Kompleks PertanianRM 131,545,000.00RM 6,000,000.00RM 5,763,879.74
96.1%
RM 15,043,229.55JANM 2018, pp. 212–213
03500Pembangunan Industri Bunga dan Komoditi BerpotensiRM 18,000,000.00RM 2,000,000.00RM 1,926,873.90
96.3%
RM 8,541,681.53JANM 2018, pp. 212–213
03700Khidmat Sokongan TeknikalRM 54,450,000.00RM 7,300,000.00RM 6,939,521.56
95.1%
RM 20,291,782.09JANM 2018, pp. 212–213
04000Pembangunan Mempelbagai PertanianRM 68,700,000.00RM 8,350,000.00RM 7,112,610.56
85.2%
RM 22,951,095.36JANM 2018, pp. 212–213
04700Pembangunan Industri PadiRM 60,500,000.00RM 3,460,000.00RM 306,898.22
8.9%
RM 4,918,306.97JANM 2018, pp. 212–213
04800Pembangunan Industri KelapaRM 23,000,000.00RM 3,500,000.00RM 3,140,368.04
89.7%
RM 10,210,944.01JANM 2018, pp. 212–213
04900Pembangunan Industri Buah-buahanRM 30,000,000.00RM 6,000,000.00RM 4,094,440.22
68.2%
RM 11,021,684.50JANM 2018, pp. 212–213
05100Kurantina Tumbuhan SarawakRM 5,000,000.00RM 350,000.00RM 0.00
0.0%
RM 0.00JANM 2018, pp. 212–213
05200Pembangunan Penyelidikan Pertanian SarawakRM 5,000,000.00RM 1,000,000.00RM 915,718.35
91.6%
RM 2,737,802.15JANM 2018, pp. 212–213
12500Pembangunan Industri Tanaman MakananRM 224,000,000.00RM 25,885,000.00RM 24,524,174.83
94.7%
RM 100,574,588.68JANM 2018, pp. 212–213
Perkhidmatan Veterinar21 projectsEstimate RM 60.43 m · Spent RM 57.07 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2018AnggaranSpent 2018Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
10710Pembangunan Industri Lembu/Kerbau PedagingRM 46,425,000.00RM 3,044,500.00RM 2,253,548.61
74.0%
RM 5,843,254.39JANM 2018, pp. 212–213
10730Pembangunan Industri TenusuRM 14,400,000.00RM 130,000.00RM 19,355.48
14.9%
RM 924,483.48JANM 2018, pp. 212–213
10750Pengeluaran Bibit dan Baka LembuRM 10,100,000.00RM 1,160,000.00RM 1,149,450.52
99.1%
RM 9,900,185.25JANM 2018, pp. 212–213
10760Pengeluaran Bibit dan Baka Ternakan Kambing BebiriNote: P.21– Butiran 10760 - Peruntukan sebanyak RM100 akan dibentangkan dalam Sesi Parlimen 2019 telah dimasuk kira sebagai pendahuluan.RM 3,200,000.00RM 224,800.00RM 224,675.00
99.9%
RM 3,190,221.77JANM 2018, pp. 212–213
10810Menaik Taraf dan Pembesaran Stesen Kuarantin Haiwan (SKH) Padang Besar PerlisRM 4,990,500.00RM 0.00RM 0.00RM 338,224.13JANM 2018, pp. 212–213
10820Pembangunan Makmal-makmal Veterinar KawasanRM 5,000,000.00RM 4,478,800.00RM 4,096,692.26
91.5%
RM 4,256,975.79JANM 2018, pp. 212–213
10860Pembangunan Semula Rumah Sembelih RuminanRM 4,005,000.00RM 425,500.00RM 410,262.37
96.4%
RM 2,881,729.22JANM 2018, pp. 212–213
10880Menaiktaraf Kemudahan LatihanRM 27,306,673.00RM 0.00RM 0.00RM 27,306,672.72JANM 2018, pp. 212–213
10900Mineral Perindustrian Semenanjung MalaysiaRM 37,100,000.00RM 0.00RM 0.00RM 2,203,636.00JANM 2018, pp. 212–213
10920Pengukuhan Penyelidikan dan Pembangunan (R & D)RM 1,500,000.00RM 300,000.00RM 122,504.50
40.8%
RM 538,785.50JANM 2018, pp. 212–213
10930Sistem Maklumat Pengurusan VeterinarRM 4,000,000.00RM 0.00RM 0.00RM 1,499,088.39JANM 2018, pp. 212–213
22000Stesen Kuarantina Haiwan SarawakRM 2,000,000.00RM 0.00RM 0.00RM 671,055.85JANM 2018, pp. 212–213
22200Rumah Penyembelihan dan Kesihatan AwamRM 34,160,000.00RM 0.00RM 0.00RM 275,010.00JANM 2018, pp. 212–213
22300Kawasan Penternakan Babi sRM 26,104,000.00RM 4,000,000.00RM 4,000,000.00
100.0%
RM 16,000,000.00JANM 2018, pp. 212–213
22500Projek Lembu Pedaging sRM 66,092,133.00RM 14,278,000.00RM 14,278,000.00
100.0%
RM 28,003,000.00JANM 2018, pp. 212–213
25000Pusat Pengeluaran, Penyelidikan dan Latihan Haiwan SarawakRM 9,000,000.00RM 1,800,000.00RM 999,993.25
55.6%
RM 4,597,759.84JANM 2018, pp. 212–213
26000Pembangunan Ternakan SarawakRM 41,000,000.00RM 11,500,000.00RM 11,500,000.00
100.0%
RM 23,582,743.68JANM 2018, pp. 212–213
28000Makmal Penyelidikan PenyakitRM 5,500,000.00RM 2,000,000.00RM 2,000,000.00
100.0%
RM 4,337,734.32JANM 2018, pp. 212–213
29000Kesihatan Awam VeterinarRM 1,500,000.00RM 250,000.00RM 0.00
0.0%
RM 733,257.10JANM 2018, pp. 212–213
41000Perkhidmatan Kuarantin dan Pemeriksaan MalaysiaRM 21,108,892.00RM 2,400,000.00RM 1,573,693.25
65.6%
RM 1,631,993.25JANM 2018, pp. 212–213
41800Jabatan Perkhidmatan Haiwan dan Perusahaan Ternak (JPHPT)RM 56,686,000.00RM 14,440,000.00RM 14,440,000.00
100.0%
RM 27,615,284.00JANM 2018, pp. 212–213
Perikanan17 projectsEstimate RM 63.46 m · Spent RM 60.59 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2018AnggaranSpent 2018Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
22501PenyelidikanRM 117,750,000.00RM 12,950,100.00RM 12,895,345.68
99.6%
RM 41,607,992.49JANM 2018, pp. 212–213
22503Peningkatan Kualiti Stok AkuakulturRM 31,000,000.00RM 4,600,000.00RM 4,546,391.62
98.8%
RM 9,745,149.74JANM 2018, pp. 212–213
22504Rangkaian Institut Latihan Akuakultur Malaysia (ILHAM)RM 40,000,000.00RM 5,800,000.00RM 5,696,401.53
98.2%
RM 13,654,818.39JANM 2018, pp. 212–213
22600Perkhidmatan Perkembangan PerikananRM 50,000,000.00RM 9,100,000.00RM 8,709,937.92
95.7%
RM 21,194,941.65JANM 2018, pp. 212–213
90700Latihan Pertanian KebangsaanRM 6,000,000.00RM 0.00RM 0.00RM 94,205.68JANM 2018, pp. 212–213
23300Pengurusan dan Pemulihan IkanRM 47,000,000.00RM 11,000,000.00RM 10,772,914.32
97.9%
RM 19,109,428.08JANM 2018, pp. 212–213
23400Kemudahan PerikananRM 29,567,000.00RM 0.00RM 0.00RM 12,127,092.43JANM 2018, pp. 212–213
23500Pengembangan dan DidikanRM 21,430,000.00RM 6,500,000.00RM 5,691,766.05
87.6%
RM 14,506,299.09JANM 2018, pp. 212–213
23702Pengurusan dan Perlindungan Sumber PerikananRM 28,580,000.00RM 5,110,000.00RM 4,584,351.90
89.7%
RM 13,104,762.82JANM 2018, pp. 212–213
24000Kemudahan Lampu Pemandu dan Penambatan VeselRM 16,370,000.00RM 0.00RM 0.00RM 11,904,401.52JANM 2018, pp. 212–213
25100Pusat Pembenihan Perikanan SabahRM 2,900,000.00RM 260,000.00RM 240,837.94
92.6%
RM 2,435,677.90JANM 2018, pp. 212–213
25200Pembangunan Akuakultur SabahRM 2,500,000.00RM 500,000.00RM 498,439.89
99.7%
RM 1,484,836.36JANM 2018, pp. 214–215
26400Peningkatan Produktiviti dan Pemuliharaan EkosistemRM 15,000,000.00RM 3,500,000.00RM 3,096,134.05
88.5%
RM 7,978,323.67JANM 2018, pp. 214–215
26900Pemantauan Maklumat Industri PerikananRM 5,230,000.00RM 1,140,000.00RM 1,095,691.66
96.1%
RM 4,092,697.10JANM 2018, pp. 214–215
27100Pembangunan Pejabat PerikananNote: P.21– Butiran 27100 - Peruntukan sebanyak RM10 akan dibentangkan dalam Sesi Parlimen 2019 telah dimasuk kira sebagai pendahuluan.RM 2,500,000.00RM 272,073.00RM 272,062.38
100.0%
RM 1,637,546.27JANM 2018, pp. 214–215
27200Pembangunan Industri Tiram SabahRM 9,280,000.00RM 2,227,937.00RM 2,030,233.72
91.1%
RM 5,954,021.88JANM 2018, pp. 214–215
27400Pembangunan Usahawan Nelayan/PengusahaRM 2,000,000.00RM 500,000.00RM 460,264.74
92.0%
RM 1,248,645.88JANM 2018, pp. 214–215
Projects printed without a group subtotal2 projects

These projects count toward the vote total but are not printed under a group heading.

CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2018AnggaranSpent 2018Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
30000Tabung Ekonomi Usaha Niaga (TEKUN)RM 1,350,000,000.00RM 107,000,000.00RM 107,000,000.00
100.0%
RM 437,000,000.00JANM 2018, pp. 214–215
94000NKEARM 5,665,149,885.00RM 179,786,500.00RM 178,609,496.70
99.3%
RM 828,973,626.62JANM 2018, pp. 214–215

Source: Jabatan Akauntan Negara, Penyata Kewangan Kerajaan Persekutuan 2018, Statement of Development Expenditure (Lampiran 2).