A development (P) vote: spending on this ministry's projects under the Eleventh Malaysia Plan (RMKe-11, 2016–2020). What each project was allocated and spent in 2016, from the audited Statement of Development Expenditure.

The same code is printed as Kementerian Air, Tanah dan Sumber Asli in 2018–2019, Kementerian Tenaga dan Sumber Asli in 2020–2022, Kementerian Sumber Asli, Alam Sekitar dan Perubahan Iklim in 2023 and Kementerian Sumber Asli dan Kelestarian Alam in 2024–2025.

All development votes in 2016 · Operating vote B.23 · P.23 in Budget 2027

Estimate 2016Anggaran
RM 1.52 bn
Spent 2016Sebenar
RM 1.50 bn
98.9% of the estimate
Total cost of projectsKos Keseluruhan
RM 17.10 bn
RMKe-11 spent to dateSebenar RMKe-11
RM 1.50 bn
Totals as printed, JANM 2016, pp. 224–225

By group

The statement prints the vote's projects under these headings, each with its own total. Hover a figure for the exact amount, or open a group below for every project to the sen.

GroupEstimate 2016AnggaranSpent 2016Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
JABATAN KETUA PENGARAH TANAH DAN GALIAN (JKPTG)/INSTUN/MaCGDI/e-TanahRM 32.54 mRM 32.18 m
98.9%
RM 32.18 mJANM 2016, pp. 222–223
Jabatan Ukur dan Pemetaan Malaysia (JUPEM)RM 110.84 mRM 110.76 m
99.9%
RM 110.76 mJANM 2016, pp. 222–223
Lembaga Penyelidikan dan Pembangunan Perhutanan Malaysia (FRIM)RM 13.28 mRM 13.28 m
100.0%
RM 13.28 mJANM 2016, pp. 224–225
Jabatan Perhutanan Semenanjung MalaysiaRM 13.58 mRM 13.46 m
99.1%
RM 13.46 mJANM 2016, pp. 224–225
Perhutanan SarawakRM 8.20 mRM 7.49 m
91.4%
RM 7.49 mJANM 2016, pp. 224–225
Perhutanan SabahRM 9.48 mRM 9.47 m
99.9%
RM 9.47 mJANM 2016, pp. 224–225
Jumlah Perhutanan Semenanjung, Sarawak dan Sabahsums Jabatan Perhutanan Semenanjung Malaysia, Perhutanan Sarawak, Perhutanan SabahRM 31.27 mRM 30.42 m
97.3%
RM 30.42 mJANM 2016, pp. 224–225
Jabatan Mineral dan GeosainsRM 39.53 mRM 39.47 m
99.8%
RM 39.47 mJANM 2016, pp. 224–225
Pengairan dan SaliranRM 1.21 bnRM 1.20 bn
98.8%
RM 1.20 bnJANM 2016, pp. 224–225

Every project

Each project exactly as printed, to the sen, with the two-page spread it was read from.

JABATAN KETUA PENGARAH TANAH DAN GALIAN (JKPTG)/INSTUN/MaCGDI/e-Tanah8 projectsEstimate RM 32.54 m · Spent RM 32.18 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2016AnggaranSpent 2016Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
02301Projek e-TanahRM 144,604,995.00RM 7,075,016.00RM 7,074,947.18
100.0%
RM 7,074,947.18JANM 2016, pp. 222–223
02302Sistem e-JKPTGRM 23,709,768.00RM 6,019,384.00RM 5,915,799.28
98.3%
RM 5,915,799.28JANM 2016, pp. 222–223
02303Rekabentuk Piawai PejabatRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 222–223
02304Bayaran Khas Pengambilan Balik TanahRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 222–223
03302Kemudahan Pengurusan Kementerian (BTM)RM 40,000,000.00RM 2,999,405.00RM 2,999,404.78
100.0%
RM 2,999,404.78JANM 2016, pp. 222–223
03303Pembinaan Institut Latihan Tanah, Ukur dan Pemetaan Negara (INSTUN)RM 31,266,000.00RM 5,660,000.00RM 5,646,598.72
99.8%
RM 5,646,598.72JANM 2016, pp. 222–223
03304Infrastruktur Data Geospatial Negara (MaCGDI)RM 65,670,000.00RM 10,789,621.00RM 10,541,494.70
97.7%
RM 10,541,494.70JANM 2016, pp. 222–223
03306Pelan Komprehensif Latihan KementerianRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 222–223
Jabatan Ukur dan Pemetaan Malaysia (JUPEM)8 projectsEstimate RM 110.84 m · Spent RM 110.76 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2016AnggaranSpent 2016Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
02600Pengautomasian Proses Kerja Topo Untuk PemetaanRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 222–223
02701Sistem Pengkalan Data Geodetik (SPDG)RM 52,000,000.00RM 10,300,000.00RM 10,299,849.98
100.0%
RM 10,299,849.98JANM 2016, pp. 222–223
02703e-PemetaanRM 223,700,000.00RM 32,773,500.00RM 32,768,167.35
100.0%
RM 32,768,167.35JANM 2016, pp. 222–223
02801Projek Penandaan,Pengukuran & Penyelenggaraan Sempadan A'bangsaNote: P.23 – Butiran 02801- Peruntukan sebanyak RM10 bagi setiap butiran akan dibentangkan dalam Sesi Parlimen 2017 telah dimasuk kira sebagai pendahuluan.RM 7,000,000.00RM 7,000,000.00RM 6,928,148.19
99.0%
RM 6,928,148.19JANM 2016, pp. 222–223
02803Pewujudan Sistem Pemetaan UtilitiRM 34,000,000.00RM 1,250,000.00RM 1,250,000.00
100.0%
RM 1,250,000.00JANM 2016, pp. 222–223
02804eKADASTERRM 263,753,600.00RM 31,817,800.00RM 31,817,680.73
100.0%
RM 31,817,680.73JANM 2016, pp. 222–223
02806Peningkatan Local Area Network (LAN) & Wide Area Network (WAN) JUPEMRM 32,400,000.00RM 4,543,010.00RM 4,542,990.90
100.0%
RM 4,542,990.90JANM 2016, pp. 222–223
02811Pembangunan Sistem Bahagian Geospatial Pertahanan (BGSP)RM 101,492,000.00RM 23,155,900.00RM 23,155,900.00
100.0%
RM 23,155,900.00JANM 2016, pp. 222–223
Projects printed without a group subtotal3 projects

These projects count toward the vote total but are not printed under a group heading.

CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2016AnggaranSpent 2016Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
07100PERHILITANRM 272,881,623.00RM 16,889,006.00RM 16,793,710.05
99.4%
RM 16,793,710.05JANM 2016, pp. 224–225
07200Jabatan Alam SekitarRM 131,935,400.00RM 15,202,618.00RM 15,087,110.48
99.2%
RM 15,087,110.48JANM 2016, pp. 224–225
07300Bahagian Konservasi dan Pemuliharaan Alam Sekitar (KAS)RM 4,890,000.00RM 1,409,600.00RM 1,387,223.40
98.4%
RM 1,387,223.40JANM 2016, pp. 224–225
Lembaga Penyelidikan dan Pembangunan Perhutanan Malaysia (FRIM)1 projectEstimate RM 13.28 m · Spent RM 13.28 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2016AnggaranSpent 2016Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
08510Pembangunan Penyelidikan Sumber, Pengurusan dan HasilRM 129,470,000.00RM 13,280,000.00RM 13,280,000.00
100.0%
RM 13,280,000.00JANM 2016, pp. 224–225
Jabatan Perhutanan Semenanjung Malaysia6 projectsEstimate RM 13.58 m · Spent RM 13.46 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2016AnggaranSpent 2016Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
08600Pengurusan Hutan Secara BerkekalanRM 262,412,630.00RM 3,129,510.00RM 3,077,001.50
98.3%
RM 3,077,001.50JANM 2016, pp. 224–225
08601Penanaman Pokok Bakau & Spesis-spesis Yang Sesuai di Persisiran PantaiRM 14,200,000.00RM 5,200,000.00RM 5,130,323.03
98.7%
RM 5,130,323.03JANM 2016, pp. 224–225
08900Pembangunan Sumber Tenaga ManusiaRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 224–225
09000Pembangunan Ladang HutanRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 224–225
09200Pengembangan Maklumat Perhutanan dan IT dan K-Perhutanan (JPSM)RM 7,700,000.00RM 5,250,000.00RM 5,250,000.00
100.0%
RM 5,250,000.00JANM 2016, pp. 224–225
09400Infrastruktur, Pengubahsuaian dan Lain-lain Kemudahan (JPSM)RM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 224–225
Perhutanan Sarawak4 projectsEstimate RM 8.20 m · Spent RM 7.49 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2016AnggaranSpent 2016Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
09400Infrastruktur,Pengubahsuaian dan Lain-lain kemudahanRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 224–225
09800Pusat Penyelidikan Perhutanan dan Botani SarawakRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 224–225
09900Projek Kemajuan Perusahaan Hutan; Sistem Maklumat Bersepadu Perhutanan SarawakRM 64,240,000.00RM 7,980,010.00RM 7,320,061.37
91.7%
RM 7,320,061.37JANM 2016, pp. 224–225
10100Pemuliharaan Hidupan Liar dan Projek Kerjasama Antarabangsa PerhutananNote: P.23– Butiran 10100 dan 17300 - Peruntukan sebanyak RM10 yang akan dibentangkan dalam Sesi Parlimen 2017 telah dimasuk kira sebagai pendahulan.RM 8,000,000.00RM 221,000.00RM 173,608.81
78.6%
RM 173,608.81JANM 2016, pp. 224–225
Perhutanan Sabah6 projectsEstimate RM 9.48 m · Spent RM 9.47 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2016AnggaranSpent 2016Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
10200Penubuhan Stesen Hutan Sejadi Sabah; Pusat Perhutanan Bersepadu Wilayah Kota KinabaluRM 8,000,000.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 224–225
10800P'gunan Kaw P'lidikan Hutan Paya Gambut Klias;Galeri Prhtn; & P'buhan Seed Orchard serta Spesis TptnRM 4,224,000.00RM 352,000.00RM 351,998.16
100.0%
RM 351,998.16JANM 2016, pp. 224–225
10801Program Sokongan dan Pembangunan Penyelidikan PerhutananRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 224–225
10802Projek Perhutanan Masyarakat di Lokasi di SabahRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 224–225
10803Program Pembangunan Mampan Sumber Hutan SabahRM 34,170,608.00RM 3,268,500.00RM 3,268,464.12
100.0%
RM 3,268,464.12JANM 2016, pp. 224–225
10804Projek Heart of Borneo (HOB) Negeri SabahRM 41,567,000.00RM 5,864,000.00RM 5,852,915.74
99.8%
RM 5,852,915.74JANM 2016, pp. 224–225
Jabatan Mineral dan Geosains6 projectsEstimate RM 39.53 m · Spent RM 39.47 m
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2016AnggaranSpent 2016Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
10900Mineral Perindustrian Semenanjung MalaysiaRM 62,500,000.00RM 14,063,490.00RM 14,059,850.43
100.0%
RM 14,059,850.43JANM 2016, pp. 224–225
11800Kajian Geobencana NegaraRM 12,000,000.00RM 1,800,000.00RM 1,795,915.82
99.8%
RM 1,795,915.82JANM 2016, pp. 224–225
11900Kajian Sumber Air Tanah NegaraRM 68,000,000.00RM 9,000,000.00RM 8,945,687.23
99.4%
RM 8,945,687.23JANM 2016, pp. 224–225
12100Pembinaan Pejabat Negeri Jabatan Mineral dan GeosainsRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 224–225
12500Pemetaan Geologi NegaraRM 79,090,000.00RM 14,666,580.00RM 14,666,107.74
100.0%
RM 14,666,107.74JANM 2016, pp. 224–225
12600Peningkatan Taraf dan Kemudahan Makmal Jabatan Mineral dan GeosainsRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 224–225
Pengairan dan Saliran21 projectsEstimate RM 1.21 bn · Spent RM 1.20 bn
CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2016AnggaranSpent 2016Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
13200Peningkatan Inovasi dan Kemajuan TeknologiRM 44,300,000.00RM 475,700.00RM 472,156.83
99.3%
RM 472,156.83JANM 2016, pp. 224–225
13400Pembangunan Sumber Air NegaraRM 52,900,000.00RM 447,500.00RM 295,141.52
66.0%
RM 295,141.52JANM 2016, pp. 224–225
13500Pemulihan EmpanganRM 424,000,000.00RM 30,475,700.00RM 29,944,387.74
98.3%
RM 29,944,387.74JANM 2016, pp. 224–225
13600Jentera-jentera dan KelengkapanRM 54,000,000.00RM 116,000.00RM 109,952.27
94.8%
RM 109,952.27JANM 2016, pp. 224–225
13700Tanggungan-tanggungan untuk pengambilan tanahRM 25,000,000.00RM 13,436,600.00RM 13,223,689.92
98.4%
RM 13,223,689.92JANM 2016, pp. 224–225
13900Rancangan Kawalan dan Isyarat Bahaya BanjirRM 598,000,000.00RM 48,700,000.00RM 48,675,152.69
100.0%
RM 48,675,152.69JANM 2016, pp. 224–225
14100Bangunan dan Pejabat J.P.S.RM 6,800,000.00RM 1,130,000.00RM 1,129,901.72
100.0%
RM 1,129,901.72JANM 2016, pp. 224–225
14200Pemulihan StrukturRM 45,920,000.00RM 1,300,000.00RM 1,299,737.11
100.0%
RM 1,299,737.11JANM 2016, pp. 224–225
14500Menaik Taraf Infrastruktur Saliran Bandar, Tebatan BanjirRM 134,140,000.00RM 9,115,900.00RM 8,170,697.88
89.6%
RM 8,170,697.88JANM 2016, pp. 224–225
14600Kajian PrakemungkinanRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 224–225
14800Projek Penggantian Peralatan PamRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 224–225
14900Penggantian dan Peningkatan Peralatan Pintu KawalanRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 224–225
15000Kerja-kerja Kecil JPS, Pelbagai NegeriRM 100,000,000.00RM 30,000,000.00RM 29,557,088.78
98.5%
RM 29,557,088.78JANM 2016, pp. 224–225
15100Mencegah Hakisan PantaiRM 391,615,985.00RM 42,370,698.00RM 42,366,387.25
100.0%
RM 42,366,387.25JANM 2016, pp. 224–225
15200Memperbaiki, Mengindah, Membersih & Merawat Air Sungai & Infrastruktur MASMARM 632,225,000.00RM 33,520,500.00RM 30,074,201.06
89.7%
RM 30,074,201.06JANM 2016, pp. 224–225
15300Mengorek Kuala-kuala SungaiRM 2,253,815,774.00RM 226,942,000.00RM 219,891,219.30
96.9%
RM 219,891,219.30JANM 2016, pp. 224–225
15400Rancangan Pengurusan Sungai Saliran Mesra AlamRM 987,247,566.00RM 211,701,488.00RM 211,699,895.50
100.0%
RM 211,699,895.50JANM 2016, pp. 224–225
15500Pembangunan Latihan dan Kemajuan KerjayaRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 224–225
16500Rancangan-rancangan Mencegah Banjir, SabahRM 0.00RM 0.00RM 0.00RM 0.00JANM 2016, pp. 224–225
16700Rancangan Tebatan Banjir (RTB) dan Saliran BandarRM 8,796,905,225.00RM 560,065,124.00RM 558,431,289.48
99.7%
RM 558,431,289.48JANM 2016, pp. 224–225
16900Penyelidikan dan PembangunanRM 63,000,000.00RM 1,400,000.00RM 1,307,109.57
93.4%
RM 1,307,109.57JANM 2016, pp. 224–225
Projects printed without a group subtotal5 projects

These projects count toward the vote total but are not printed under a group heading.

CodeKodProjectMaksud PerbelanjaanTotal costKos KeseluruhanEstimate 2016AnggaranSpent 2016Sebenar% usedPrestasiRMKe-11 to dateSebenar RMKe-11SourceSumber
17000NAHRIMRM 95,544,555.00RM 15,393,600.00RM 15,374,532.78
99.9%
RM 15,374,532.78JANM 2016, pp. 224–225
17100Taman LautRM 94,990,000.00RM 10,861,100.00RM 10,858,020.71
100.0%
RM 10,858,020.71JANM 2016, pp. 224–225
17200Bahagian Pengurusan Biodiversiti dan PerhutananRM 73,014,000.00RM 18,604,000.00RM 17,590,112.78
94.5%
RM 17,590,112.78JANM 2016, pp. 224–225
17300Bahagian Mineral dan GeosainsNote: P.23– Butiran 10100 dan 17300 - Peruntukan sebanyak RM10 yang akan dibentangkan dalam Sesi Parlimen 2017 telah dimasuk kira sebagai pendahulan.RM 1,350,000.00RM 39,000.00RM 30,765.75
78.9%
RM 30,765.75JANM 2016, pp. 224–225
17500Pasukan Teras BiokeselamatanRM 2,200,000.00RM 800,000.00RM 787,058.50
98.4%
RM 787,058.50JANM 2016, pp. 224–225

Source: Jabatan Akauntan Negara, Penyata Kewangan Kerajaan Persekutuan 2016, Statement of Development Expenditure (Lampiran 2).