Kementerian Peralihan Tenaga dan Transformasi Air

Its running costs are supply vote B.33 and its projects development vote P.33. In 2020 it was printed as Kementerian Alam Sekitar dan Air.

The 2020 operating figures were read by OCR.

The published statement draws these tables without a text layer, so every amount was read from the page. Each printed total equals the sum of its rows or is a misprint confirmed on the page. Programme and activity names are OCR readings. How this was done

Spent in 2020
RM 2.36 bn
Share of federal spending
0.8%
of RM 313.98 bn
Rank
15th
of 39 ministries and departments

Kementerian Alam Sekitar dan Air spent RM 2.36 bn in 2020: RM 298.38 m on running costs and RM 2.07 bn on development projects. That was 0.8% of federal spending. Under the same vote number it has also been printed as Kementerian Alam Sekitar dan Air; reorganisations can move programmes between ministries.

2020: Kementerian Alam Sekitar dan Air, RM 2.36 bnRM 2.36 bn20202021: Kementerian Alam Sekitar dan Air, RM 2.79 bnRM 2.79 bn20212022: Kementerian Alam Sekitar dan Air, RM 3.43 bnRM 3.43 bn20222023: Kementerian Alam Sekitar dan Air, RM 0.00RM 0.0020232024: Kementerian Peralihan Tenaga dan Transformasi Air, RM 4.06 bnRM 4.06 bn20242025: Kementerian Peralihan Tenaga dan Transformasi Air, RM 4.80 bnRM 4.80 bn2025
Operating Development

Where its operating budget went in 2020

ProgrammeRevised budgetSpentShare
Pengurusan Alam SekitarRM 156.26 mRM 153.30 m51.4%
Pengurusan AirRM 142.51 mRM 139.40 m46.7%
PengurusanRM 3.36 mRM 2.38 m0.8%
"one-off"RM 2.34 mRM 2.00 m0.7%
Program KhususRM 1.53 mRM 1.31 m0.4%

Every activity and spending category in B.33, with sources

Largest development projects in 2020

ProjectBudgetSpent
Projek Pembentungan NegaraRM 881.38 mRM 659.09 m
Rancangan Tebatan Banjir (RTB) dan Saliran BandarRM 366.90 mRM 345.36 m
NRW NasionalRM 268.85 mRM 263.57 m
Mengorek Kuala-Kuala SungaiRM 167.16 mRM 163.90 m
Rancangan Pengurusan Sungai Saliran Mesra AlamRM 130.85 mRM 121.32 m
Rancangan Bekalan Air SarawakRM 106.04 mRM 95.69 m
Rancangan Bekalan Air SabahRM 123.53 mRM 72.03 m
Jabatan Alam SekitarRM 60.21 mRM 57.03 m
Menaiktaraf Infrastruktur dan Saliran Bandar, Tebatan BanjirRM 41.11 mRM 39.15 m
Rancangan Kawalan dan Isyarat Bahaya BanjirRM 35.26 mRM 34.19 m

Every project in P.33, with sources

Budget 2027

Budget 2027 as tabled allocates RM 5.33 bn to Kementerian Peralihan Tenaga dan Transformasi Air, against RM 5.19 bn in the 2026 budget. See the budget by programme.