Kementerian Alam Sekitar dan Air
Its operating spending is supply vote B.33 and its projects development vote P.33.
The 2020 operating figures were read by OCR.
The published statement draws these tables without a text layer, so every amount was read from the page. Each printed total equals the sum of its rows or is a misprint confirmed on the page. Programme and activity names are OCR readings. How this was done
Kementerian Alam Sekitar dan Air spent RM 2.36 bn in 2020: RM 298.38 m on operating spending and RM 2.07 bn on development projects. That was 0.8% of federal spending. P.33 was still printed, with nothing spent, in 2023.
Where its operating budget went in 2020
| Programme | Revised budget | Spent | Share |
|---|---|---|---|
| Pengurusan Alam Sekitar | RM 156.26 m | RM 153.30 m | 51.4% |
| Pengurusan Air | RM 142.51 m | RM 139.40 m | 46.7% |
| Pengurusan | RM 3.36 m | RM 2.38 m | 0.8% |
| "one-off" | RM 2.34 m | RM 2.00 m | 0.7% |
| Program Khusus | RM 1.53 m | RM 1.31 m | 0.4% |
Largest development projects in 2020
| Project | Budget | Spent |
|---|---|---|
| Projek Pembentungan Negara | RM 881.38 m | RM 659.09 m |
| Rancangan Tebatan Banjir (RTB) dan Saliran Bandar | RM 366.90 m | RM 345.36 m |
| NRW Nasional | RM 268.85 m | RM 263.57 m |
| Mengorek Kuala-Kuala Sungai | RM 167.16 m | RM 163.90 m |
| Rancangan Pengurusan Sungai Saliran Mesra Alam | RM 130.85 m | RM 121.32 m |
| Rancangan Bekalan Air Sarawak | RM 106.04 m | RM 95.69 m |
| Rancangan Bekalan Air Sabah | RM 123.53 m | RM 72.03 m |
| Jabatan Alam Sekitar | RM 60.21 m | RM 57.03 m |
| Menaiktaraf Infrastruktur dan Saliran Bandar, Tebatan Banjir | RM 41.11 m | RM 39.15 m |
| Rancangan Kawalan dan Isyarat Bahaya Banjir | RM 35.26 m | RM 34.19 m |
Names
- Kementerian Alam Sekitar dan Air10 Mar 2020 to 31 Dec 2023 · printed · masthead: Kementerian Alam Sekitar dan Air
- KASA10 Mar 2020 to 3 Dec 2022 · acronym · Lampiran 2, PDF p281 note
Lineage
- Environment; MetMalaysia; MGTC moved from Kementerian Sains, Teknologi dan Inovasi on 10 Mar 2020.Lampiran 2, PDF p281 note
- Water; sewerage; JPS; NAHRIM moved from Kementerian Sumber Asli dan Kelestarian Alam on 2 Apr 2020.Malaysiakini, 2 Apr 2020: water functions moved to the Environment and Water Ministry
- All of this ministry became part of Kementerian Sumber Asli dan Kelestarian Alam on 3 Dec 2022.PDF p39 note 4
B/P.33 was held by this ministry from 2020 to 2023, then by Kementerian Peralihan Tenaga dan Transformasi Air since 2024.
Budget 2027
Budget 2027 as tabled allocates RM 5.33 bn to Kementerian Alam Sekitar dan Air, against RM 5.19 bn in the 2026 budget. See the budget by programme.