A supply (B) vote: the operating spending Parliament voted for this ministry. What it was given and what it spent in 2024, by programme and activity, from the audited Statement of Operating Expenditure.
The same code is printed as Kementerian Kesejahteraan Bandar, Perumahan dan Kerajaan Tempatan in 2016–2017.
All operating votes in 2024 · Development vote P.43 · B.43 in Budget 2027
By programme
Each programme's totals as the statement prints them. Hover a figure for the exact amount, or open an activity below for every line to the sen.
| CodeKod | ProgrammeProgram | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 010000 | Pengurusan | RM 108.50 m | RM 109.59 m | RM 109.59 m | 100.0% | RM 343.24 | JANM 2024, p. 164 |
| 020000 | Persekitaran Bandar Mampan | RM 254.19 m | RM 250.28 m | RM 250.28 m | 100.0% | RM 770.44 | JANM 2024, p. 164 |
| 030000 | Komuniti Bandar Mampan | RM 1.09 bn | RM 1.10 bn | RM 1.10 bn | 100.0% | RM 823.06 | JANM 2024, p. 165 |
| 040000 | Program Khusus | RM 414.46 m | RM 413.13 m | RM 413.13 m | 100.0% | RM 82.90 | JANM 2024, p. 166 |
Every activity, line by line
Open an activity to see its spending categories exactly as printed, to the sen, each with the page it was read from.
010000Pengurusan
010100Pengurusan AmRevised RM 101.45 mSpent RM 101.45 m100.0%
Activity total as printed: revised RM 101,454,279.00, spent RM 101,454,094.08 (JANM 2024, p. 164).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 55,601,600.00 | RM 57,014,315.00 | RM 57,014,279.70 | 100.0% | RM 35.30 | JANM 2024, p. 164 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 38,266,300.00 | RM 39,909,357.00 | RM 39,909,290.07 | 100.0% | RM 66.93 | JANM 2024, p. 164 |
| 30000 | AssetsAset | RM 1,497,000.00 | RM 1,730,650.00 | RM 1,730,615.83 | 100.0% | RM 34.17 | JANM 2024, p. 164 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 4,940,800.00 | RM 2,799,057.00 | RM 2,799,008.48 | 100.0% | RM 48.52 | JANM 2024, p. 164 |
| 50000 | Other ExpendituresPerbelanjaan-perbelanjaan Lain | RM 1,000.00 | RM 900.00 | RM 900.00 | 100.0% | RM 0.00 | JANM 2024, p. 164 |
010200Institut Latihan Perumahan dan Kerajaan Tempatan (I-KPKT)Revised RM 8.14 mSpent RM 8.14 m100.0%
Activity total as printed: revised RM 8,135,300.00, spent RM 8,135,141.68 (JANM 2024, p. 164).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 1,763,400.00 | RM 1,779,800.00 | RM 1,779,762.16 | 100.0% | RM 37.84 | JANM 2024, p. 164 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 6,320,100.00 | RM 6,251,600.00 | RM 6,251,556.70 | 100.0% | RM 43.30 | JANM 2024, p. 164 |
| 30000 | AssetsAset | RM 106,000.00 | RM 103,900.00 | RM 103,822.82 | 99.9% | RM 77.18 | JANM 2024, p. 164 |
020000Persekitaran Bandar Mampan
020100Kerajaan TempatanRevised RM 56.75 mSpent RM 56.75 m100.0%
Activity total as printed: revised RM 56,754,840.00, spent RM 56,754,657.81 (JANM 2024, p. 164).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 26,126,000.00 | RM 26,670,800.00 | RM 26,670,708.35 | 100.0% | RM 91.65 | JANM 2024, p. 164 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 6,806,300.00 | RM 5,169,640.00 | RM 5,169,607.44 | 100.0% | RM 32.56 | JANM 2024, p. 164 |
| 30000 | AssetsAset | RM 1,985,400.00 | RM 2,012,500.00 | RM 2,012,486.16 | 100.0% | RM 13.84 | JANM 2024, p. 164 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 22,705,300.00 | RM 22,901,900.00 | RM 22,901,855.86 | 100.0% | RM 44.14 | JANM 2024, p. 164 |
020200Pengurusan Sisa Pepejal NegaraRevised RM 8.40 mSpent RM 8.40 m100.0%
Activity total as printed: revised RM 8,398,274.00, spent RM 8,398,197.41 (JANM 2024, p. 164).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 6,518,500.00 | RM 6,740,600.00 | RM 6,740,530.03 | 100.0% | RM 69.97 | JANM 2024, p. 164 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 1,592,000.00 | RM 1,544,374.00 | RM 1,544,367.38 | 100.0% | RM 6.62 | JANM 2024, p. 164 |
| 30000 | AssetsAset | RM 30,000.00 | RM 113,300.00 | RM 113,300.00 | 100.0% | RM 0.00 | JANM 2024, p. 164 |
020300Perbadanan Pengurusan Sisa Pepejal dan Pembersihan Awam (SWCorp)Revised RM 88.00 mSpent RM 88.00 m100.0%
Activity total as printed: revised RM 88,000,000.00, spent RM 88,000,000.00 (JANM 2024, p. 164).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 88,000,000.00 | RM 88,000,000.00 | RM 88,000,000.00 | 100.0% | RM 0.00 | JANM 2024, p. 164 |
020400Perancangan Bandar dan Desa (PLANMalaysia)Revised RM 59.31 mSpent RM 59.31 m100.0%
Activity total as printed: revised RM 59,314,810.00, spent RM 59,314,624.11 (JANM 2024, p. 164).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 43,251,800.00 | RM 43,307,800.00 | RM 43,307,764.65 | 100.0% | RM 35.35 | JANM 2024, p. 164 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 15,858,500.00 | RM 15,194,410.00 | RM 15,194,360.22 | 100.0% | RM 49.78 | JANM 2024, p. 164 |
| 30000 | AssetsAset | RM 794,500.00 | RM 659,300.00 | RM 659,229.24 | 100.0% | RM 70.76 | JANM 2024, p. 164 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 22,400.00 | RM 153,300.00 | RM 153,270.00 | 100.0% | RM 30.00 | JANM 2024, p. 164 |
020500Kemampanan Bandar dan Persekitaran HijauRevised RM 4.39 mSpent RM 4.39 m100.0%
Activity total as printed: revised RM 4,393,949.00, spent RM 4,393,894.73 (JANM 2024, p. 164).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 3,532,300.00 | RM 3,576,100.00 | RM 3,576,084.40 | 100.0% | RM 15.60 | JANM 2024, p. 164 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 1,307,700.00 | RM 817,849.00 | RM 817,810.33 | 100.0% | RM 38.67 | JANM 2024, p. 164 |
020600Landskap NegaraRevised RM 19.91 mSpent RM 19.91 m100.0%
Activity total as printed: revised RM 19,907,100.00, spent RM 19,907,032.51 (JANM 2024, p. 164).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 11,163,500.00 | RM 11,674,300.00 | RM 11,674,269.38 | 100.0% | RM 30.62 | JANM 2024, p. 164 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 8,418,200.00 | RM 6,730,100.00 | RM 6,730,074.28 | 100.0% | RM 25.72 | JANM 2024, p. 164 |
| 30000 | AssetsAset | RM 708,300.00 | RM 658,700.00 | RM 658,688.85 | 100.0% | RM 11.15 | JANM 2024, p. 164 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 1,100,000.00 | RM 844,000.00 | RM 844,000.00 | 100.0% | RM 0.00 | JANM 2024, p. 164 |
020700Pembangunan Kampung BaruRevised RM 13.51 mSpent RM 13.51 m100.0%
Activity total as printed: revised RM 13,512,300.00, spent RM 13,512,095.99 (JANM 2024, p. 164).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 2,129,600.00 | RM 2,330,700.00 | RM 2,330,601.97 | 100.0% | RM 98.03 | JANM 2024, p. 164 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 681,400.00 | RM 557,100.00 | RM 557,031.43 | 100.0% | RM 68.57 | JANM 2024, p. 164 |
| 30000 | AssetsAset | RM 0.00 | RM 54,000.00 | RM 54,000.00 | 100.0% | RM 0.00 | JANM 2024, p. 164 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 11,460,300.00 | RM 10,570,500.00 | RM 10,570,462.59 | 100.0% | RM 37.41 | JANM 2024, p. 164 |
030000Komuniti Bandar Mampan
030100Bomba dan PenyelamatRevised RM 1.02 bnSpent RM 1.02 bn100.0%
Activity total as printed: revised RM 1,024,714,050.00, spent RM 1,024,713,870.77 (JANM 2024, p. 165).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 713,167,300.00 | RM 720,822,800.00 | RM 720,822,800.00 | 100.0% | RM 0.00 | JANM 2024, p. 165 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 300,345,500.00 | RM 296,910,640.00 | RM 296,910,598.84 | 100.0% | RM 41.16 | JANM 2024, p. 165 |
| 30000 | AssetsAset | RM 3,015,000.00 | RM 5,195,310.00 | RM 5,195,211.93 | 100.0% | RM 98.07 | JANM 2024, p. 165 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 1,792,900.00 | RM 1,785,300.00 | RM 1,785,260.00 | 100.0% | RM 40.00 | JANM 2024, p. 165 |
030200Perumahan NegaraRevised RM 37.40 mSpent RM 37.40 m100.0%
Activity total as printed: revised RM 37,404,740.00, spent RM 37,404,604.03 (JANM 2024, p. 165).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 20,564,100.00 | RM 22,734,200.00 | RM 22,734,151.39 | 100.0% | RM 48.61 | JANM 2024, p. 165 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 9,374,100.00 | RM 9,115,040.00 | RM 9,115,018.12 | 100.0% | RM 21.88 | JANM 2024, p. 165 |
| 30000 | AssetsAset | RM 490,000.00 | RM 443,300.00 | RM 443,244.56 | 100.0% | RM 55.44 | JANM 2024, p. 165 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 5,396,000.00 | RM 5,112,200.00 | RM 5,112,189.96 | 100.0% | RM 10.04 | JANM 2024, p. 165 |
030300Bahagian Kawalan Kredit KomunitiRevised RM 5.73 mSpent RM 5.73 m100.0%
Activity total as printed: revised RM 5,732,237.00, spent RM 5,732,108.52 (JANM 2024, p. 165).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 4,883,700.00 | RM 4,971,100.00 | RM 4,971,049.25 | 100.0% | RM 50.75 | JANM 2024, p. 165 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 630,900.00 | RM 761,137.00 | RM 761,059.27 | 100.0% | RM 77.73 | JANM 2024, p. 165 |
030400Tribunal Perumahan dan Pengurusan StrataRevised RM 9.61 mSpent RM 9.61 m100.0%
Activity total as printed: revised RM 9,607,556.00, spent RM 9,607,404.64 (JANM 2024, p. 165).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 6,279,400.00 | RM 6,615,200.00 | RM 6,615,127.63 | 100.0% | RM 72.37 | JANM 2024, p. 165 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 3,614,300.00 | RM 2,992,356.00 | RM 2,992,277.01 | 100.0% | RM 78.99 | JANM 2024, p. 165 |
| 30000 | AssetsAset | RM 22,000.00 | RM 0.00 | RM 0.00 | 0.0% | RM 0.00 | JANM 2024, p. 165 |
030500Kesejahteraan KomunitiRevised RM 12.64 mSpent RM 12.64 m100.0%
Activity total as printed: revised RM 12,636,164.00, spent RM 12,636,007.70 (JANM 2024, p. 165).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 8,369,900.00 | RM 7,305,100.00 | RM 7,305,032.62 | 100.0% | RM 67.38 | JANM 2024, p. 165 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 1,714,100.00 | RM 1,354,164.00 | RM 1,354,096.51 | 100.0% | RM 67.49 | JANM 2024, p. 165 |
| 30000 | AssetsAset | RM 35,000.00 | RM 0.00 | RM 0.00 | 0.0% | RM 0.00 | JANM 2024, p. 165 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 4,631,000.00 | RM 3,976,900.00 | RM 3,976,878.57 | 100.0% | RM 21.43 | JANM 2024, p. 165 |
030600Perancangan PerumahanRevised RM 5.15 mSpent RM 5.15 m100.0%
Activity total as printed: revised RM 5,145,271.00, spent RM 5,145,199.28 (JANM 2024, p. 165).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 4,943,600.00 | RM 3,506,600.00 | RM 3,506,588.94 | 100.0% | RM 11.06 | JANM 2024, p. 165 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 1,815,700.00 | RM 1,638,671.00 | RM 1,638,610.34 | 100.0% | RM 60.66 | JANM 2024, p. 165 |
| 30000 | AssetsAset | RM 7,000.00 | RM 0.00 | RM 0.00 | 0.0% | RM 0.00 | JANM 2024, p. 165 |
040000Program Khusus
040100Bertugas ke Luar NegaraRevised RM 2.43 mSpent RM 2.43 m100.0%
Activity total as printed: revised RM 2,428,600.00, spent RM 2,428,595.33 (JANM 2024, p. 165).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 3,150,000.00 | RM 2,428,600.00 | RM 2,428,595.33 | 100.0% | RM 4.67 | JANM 2024, p. 165 |
040200Emolumen Kakitangan KontrakRevised RM 4.58 mSpent RM 4.58 m100.0%
Activity total as printed: revised RM 4,581,980.00, spent RM 4,581,964.42 (JANM 2024, p. 165).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 4,786,600.00 | RM 4,581,980.00 | RM 4,581,964.42 | 100.0% | RM 15.58 | JANM 2024, p. 165 |
040300Sumbangan Membantu Kadar (SMK)Revised RM 398.68 mSpent RM 398.68 m100.0%
Activity total as printed: revised RM 398,679,886.00, spent RM 398,679,853.35 (JANM 2024, p. 165).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 393,870,000.00 | RM 398,679,886.00 | RM 398,679,853.35 | 100.0% | RM 32.65 | JANM 2024, p. 165 |
040400UrbaniceRevised RM 900,000.00Spent RM 900,000.00100.0%
Activity total as printed: revised RM 900,000.00, spent RM 900,000.00 (JANM 2024, p. 165).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 900,000.00 | RM 900,000.00 | RM 900,000.00 | 100.0% | RM 0.00 | JANM 2024, p. 165 |
040500Penilaian dan Perawatan Kawasan HijauRevised RM 489,700.00Spent RM 489,670.00100.0%
Activity total as printed: revised RM 489,700.00, spent RM 489,670.00 (JANM 2024, p. 165).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 500,000.00 | RM 489,700.00 | RM 489,670.00 | 100.0% | RM 30.00 | JANM 2024, p. 165 |
040600Program Kebersihan NegaraRevised RM 1.19 mSpent RM 1.19 m100.0%
Activity total as printed: revised RM 1,193,300.00, spent RM 1,193,300.00 (JANM 2024, p. 165).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 1,250,000.00 | RM 1,193,300.00 | RM 1,193,300.00 | 100.0% | RM 0.00 | JANM 2024, p. 165 |
040700Bantuan Sisa Pepejal Pihak Berkuasa TempatanRevised RM 4.85 mSpent RM 4.85 m100.0%
Activity total as printed: revised RM 4,851,964.00, spent RM 4,851,964.00 (JANM 2024, p. 165).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 10,000,000.00 | RM 4,851,964.00 | RM 4,851,964.00 | 100.0% | RM 0.00 | JANM 2024, p. 165 |
Source: Jabatan Akauntan Negara, Penyata Kewangan Kerajaan Persekutuan 2024, Statement of Operating Expenditure (Lampiran 1). % used and unspent are worked out from the printed columns.