Perbendaharaan
A supply (B) vote: the operating spending Parliament voted for this ministry. What it was given and what it spent in 2024, by programme and activity, from the audited Statement of Operating Expenditure.
By programme
Each programme's totals as the statement prints them. Hover a figure for the exact amount, or open an activity below for every line to the sen.
| CodeKod | ProgrammeProgram | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 010000 | Pengurusan | RM 353.49 m | RM 182.84 m | RM 182.84 m | 100.0% | RM 433.49 | JANM 2024, p. 112 |
| 020000 | Strategi Fiskal | RM 1.23 bn | RM 1.28 bn | RM 1.28 bn | 100.0% | RM 706.28 | JANM 2024, p. 113 |
| 030000 | Strategi Pelaburan | RM 107.54 m | RM 141.05 m | RM 141.05 m | 100.0% | RM 282.89 | JANM 2024, p. 113 |
| 040000 | Perkhidmatan Kewangan Awam | RM 221.79 m | RM 228.58 m | RM 228.58 m | 100.0% | RM 827.19 | JANM 2024, p. 114 |
| 050000 | Perkhidmatan Perakaunan | RM 282.30 m | RM 275.28 m | RM 275.27 m | 100.0% | RM 1,103.07 | JANM 2024, p. 115 |
| 060000 | Program Khusus | RM 2.22 bn | RM 2.31 bn | RM 2.31 bn | 100.0% | RM 320.09 | JANM 2024, p. 115 |
Every activity, line by line
Open an activity to see its spending categories exactly as printed, to the sen, each with the page it was read from.
010000Pengurusan
010100Pengurusan AmRevised RM 159.27 mSpent RM 159.27 m100.0%
Activity total as printed: revised RM 159,268,898.00, spent RM 159,268,683.91 (JANM 2024, p. 112).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 36,592,600.00 | RM 36,203,745.00 | RM 36,203,689.56 | 100.0% | RM 55.44 | JANM 2024, p. 112 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 239,345,200.00 | RM 93,326,918.00 | RM 93,326,903.52 | 100.0% | RM 14.48 | JANM 2024, p. 112 |
| 30000 | AssetsAset | RM 1,658,100.00 | RM 3,086,095.00 | RM 3,086,044.16 | 100.0% | RM 50.84 | JANM 2024, p. 112 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 50,070,000.00 | RM 26,651,640.00 | RM 26,651,623.84 | 100.0% | RM 16.16 | JANM 2024, p. 112 |
| 50000 | Other ExpendituresPerbelanjaan-perbelanjaan Lain | RM 1,340,600.00 | RM 500.00 | RM 422.83 | 84.6% | RM 77.17 | JANM 2024, p. 112 |
010200Kawalan Kewangan Strategik dan KorporatRevised RM 6.74 mSpent RM 6.74 m100.0%
Activity total as printed: revised RM 6,742,200.00, spent RM 6,742,138.66 (JANM 2024, p. 112).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 5,281,000.00 | RM 5,063,300.00 | RM 5,063,262.67 | 100.0% | RM 37.33 | JANM 2024, p. 112 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 1,826,600.00 | RM 1,678,900.00 | RM 1,678,875.99 | 100.0% | RM 24.01 | JANM 2024, p. 112 |
010300Pengurusan Teknologi MaklumatRevised RM 16.83 mSpent RM 16.83 m100.0%
Activity total as printed: revised RM 16,826,700.00, spent RM 16,826,541.94 (JANM 2024, p. 112).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 6,779,100.00 | RM 6,467,900.00 | RM 6,467,844.04 | 100.0% | RM 55.96 | JANM 2024, p. 112 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 6,575,900.00 | RM 4,460,500.00 | RM 4,460,489.03 | 100.0% | RM 10.97 | JANM 2024, p. 112 |
| 30000 | AssetsAset | RM 4,017,100.00 | RM 5,898,300.00 | RM 5,898,208.87 | 100.0% | RM 91.13 | JANM 2024, p. 112 |
020000Strategi Fiskal
020100Fiskal dan EkonomiRevised RM 10.50 mSpent RM 10.50 m100.0%
Activity total as printed: revised RM 10,496,700.00, spent RM 10,496,514.14 (JANM 2024, p. 112).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 9,254,500.00 | RM 9,158,800.00 | RM 9,158,737.41 | 100.0% | RM 62.59 | JANM 2024, p. 112 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 2,401,000.00 | RM 1,203,800.00 | RM 1,203,709.48 | 100.0% | RM 90.52 | JANM 2024, p. 112 |
| 30000 | AssetsAset | RM 0.00 | RM 120,900.00 | RM 120,871.00 | 100.0% | RM 29.00 | JANM 2024, p. 112 |
| 50000 | Other ExpendituresPerbelanjaan-perbelanjaan Lain | RM 10,900.00 | RM 13,200.00 | RM 13,196.25 | 100.0% | RM 3.75 | JANM 2024, p. 112 |
020200CukaiRevised RM 15.77 mSpent RM 15.77 m100.0%
Activity total as printed: revised RM 15,774,900.00, spent RM 15,774,765.24 (JANM 2024, p. 112).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 10,629,900.00 | RM 10,502,600.00 | RM 10,502,561.59 | 100.0% | RM 38.41 | JANM 2024, p. 112 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 15,687,000.00 | RM 1,313,700.00 | RM 1,313,673.69 | 100.0% | RM 26.31 | JANM 2024, p. 112 |
| 30000 | AssetsAset | RM 3,366,000.00 | RM 3,285,200.00 | RM 3,285,153.37 | 100.0% | RM 46.63 | JANM 2024, p. 112 |
| 50000 | Other ExpendituresPerbelanjaan-perbelanjaan Lain | RM 699,600.00 | RM 673,400.00 | RM 673,376.59 | 100.0% | RM 23.41 | JANM 2024, p. 112 |
020300Belanjawan NegaraRevised RM 18.53 mSpent RM 18.53 m100.0%
Activity total as printed: revised RM 18,527,100.00, spent RM 18,526,934.57 (JANM 2024, p. 112).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 12,442,300.00 | RM 13,018,000.00 | RM 13,017,908.92 | 100.0% | RM 91.08 | JANM 2024, p. 112 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 11,978,100.00 | RM 2,257,042.00 | RM 2,256,967.65 | 100.0% | RM 74.35 | JANM 2024, p. 112 |
| 30000 | AssetsAset | RM 2,569,000.00 | RM 3,252,058.00 | RM 3,252,058.00 | 100.0% | RM 0.00 | JANM 2024, p. 112 |
020400AntarabangsaRevised RM 5.74 mSpent RM 5.74 m100.0%
Activity total as printed: revised RM 5,739,000.00, spent RM 5,738,871.80 (JANM 2024, p. 113).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 2,959,800.00 | RM 3,257,600.00 | RM 3,257,591.14 | 100.0% | RM 8.86 | JANM 2024, p. 113 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 1,501,400.00 | RM 239,000.00 | RM 238,964.70 | 100.0% | RM 35.30 | JANM 2024, p. 113 |
| 30000 | AssetsAset | RM 61,400.00 | RM 1,342,400.00 | RM 1,342,315.96 | 100.0% | RM 84.04 | JANM 2024, p. 113 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 0.00 | RM 900,000.00 | RM 900,000.00 | 100.0% | RM 0.00 | JANM 2024, p. 113 |
020500Kastam Diraja MalaysiaRevised RM 1.23 bnSpent RM 1.23 bn100.0%
Activity total as printed: revised RM 1,226,705,500.00, spent RM 1,226,705,407.97 (JANM 2024, p. 113).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 807,500,000.00 | RM 844,058,200.00 | RM 844,058,194.22 | 100.0% | RM 5.78 | JANM 2024, p. 113 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 318,544,400.00 | RM 346,156,800.00 | RM 346,156,781.57 | 100.0% | RM 18.43 | JANM 2024, p. 113 |
| 30000 | AssetsAset | RM 28,310,400.00 | RM 35,329,500.00 | RM 35,329,490.26 | 100.0% | RM 9.74 | JANM 2024, p. 113 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 483,000.00 | RM 432,000.00 | RM 431,968.82 | 100.0% | RM 31.18 | JANM 2024, p. 113 |
| 50000 | Other ExpendituresPerbelanjaan-perbelanjaan Lain | RM 500,000.00 | RM 729,000.00 | RM 728,973.10 | 100.0% | RM 26.90 | JANM 2024, p. 113 |
030000Strategi Pelaburan
030100Syarikat Pelaburan KerajaanRevised RM 29.84 mSpent RM 29.84 m100.0%
Activity total as printed: revised RM 29,842,100.00, spent RM 29,842,083.58 (JANM 2024, p. 113).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 5,535,900.00 | RM 5,672,800.00 | RM 5,672,799.41 | 100.0% | RM 0.59 | JANM 2024, p. 113 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 5,455,400.00 | RM 3,169,300.00 | RM 3,169,284.17 | 100.0% | RM 15.83 | JANM 2024, p. 113 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 21,000,000.00 | RM 21,000,000.00 | RM 21,000,000.00 | 100.0% | RM 0.00 | JANM 2024, p. 113 |
030200Pengurusan Strategik Badan BerkanunRevised RM 3.93 mSpent RM 3.93 m100.0%
Activity total as printed: revised RM 3,929,600.00, spent RM 3,929,522.66 (JANM 2024, p. 113).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 3,622,100.00 | RM 3,776,100.00 | RM 3,776,089.22 | 100.0% | RM 10.78 | JANM 2024, p. 113 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 150,400.00 | RM 153,500.00 | RM 153,433.44 | 100.0% | RM 66.56 | JANM 2024, p. 113 |
030300Pelaburan StrategikRevised RM 8.01 mSpent RM 8.01 m100.0%
Activity total as printed: revised RM 8,008,200.00, spent RM 8,008,074.83 (JANM 2024, p. 113).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 7,463,200.00 | RM 7,428,600.00 | RM 7,428,571.42 | 100.0% | RM 28.58 | JANM 2024, p. 113 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 430,000.00 | RM 349,700.00 | RM 349,675.94 | 100.0% | RM 24.06 | JANM 2024, p. 113 |
| 30000 | AssetsAset | RM 0.00 | RM 206,800.00 | RM 206,735.84 | 100.0% | RM 64.16 | JANM 2024, p. 113 |
| 50000 | Other ExpendituresPerbelanjaan-perbelanjaan Lain | RM 0.00 | RM 23,100.00 | RM 23,091.63 | 100.0% | RM 8.37 | JANM 2024, p. 113 |
030400Pengurusan Aset AwamRevised RM 8.83 mSpent RM 8.83 m100.0%
Activity total as printed: revised RM 8,834,700.00, spent RM 8,834,636.04 (JANM 2024, p. 113).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 6,847,400.00 | RM 7,262,100.00 | RM 7,262,065.09 | 100.0% | RM 34.91 | JANM 2024, p. 113 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 6,983,700.00 | RM 1,572,600.00 | RM 1,572,570.95 | 100.0% | RM 29.05 | JANM 2024, p. 113 |
| 50000 | Other ExpendituresPerbelanjaan-perbelanjaan Lain | RM 50,000.00 | RM 0.00 | RM 0.00 | 0.0% | RM 0.00 | JANM 2024, p. 113 |
030500Lembaga Pembangunan Langkawi (LADA)Revised RM 90.44 mSpent RM 90.44 m100.0%
Activity total as printed: revised RM 90,438,000.00, spent RM 90,438,000.00 (JANM 2024, p. 113).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 50,000,000.00 | RM 90,438,000.00 | RM 90,438,000.00 | 100.0% | RM 0.00 | JANM 2024, p. 113 |
040000Perkhidmatan Kewangan Awam
040100Perolehan KerajaanRevised RM 39.69 mSpent RM 39.69 m100.0%
Activity total as printed: revised RM 39,690,100.00, spent RM 39,689,919.07 (JANM 2024, p. 113).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 21,819,200.00 | RM 22,228,300.00 | RM 22,228,290.78 | 100.0% | RM 9.22 | JANM 2024, p. 113 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 13,223,300.00 | RM 7,231,100.00 | RM 7,231,072.64 | 100.0% | RM 27.36 | JANM 2024, p. 113 |
| 30000 | AssetsAset | RM 0.00 | RM 6,100.00 | RM 6,026.40 | 98.8% | RM 73.60 | JANM 2024, p. 113 |
| 50000 | Other ExpendituresPerbelanjaan-perbelanjaan Lain | RM 6,502,000.00 | RM 10,224,600.00 | RM 10,224,529.25 | 100.0% | RM 70.75 | JANM 2024, p. 113 |
040200Pesuruhjaya Khas Cukai PendapatanRevised RM 2.05 mSpent RM 2.05 m100.0%
Activity total as printed: revised RM 2,045,192.00, spent RM 2,045,092.56 (JANM 2024, p. 114).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 1,643,600.00 | RM 1,743,060.00 | RM 1,742,971.06 | 100.0% | RM 88.94 | JANM 2024, p. 114 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 266,900.00 | RM 253,532.00 | RM 253,521.50 | 100.0% | RM 10.50 | JANM 2024, p. 114 |
| 30000 | AssetsAset | RM 54,000.00 | RM 48,600.00 | RM 48,600.00 | 100.0% | RM 0.00 | JANM 2024, p. 114 |
040300Tribunal Rayuan KastamRevised RM 1.70 mSpent RM 1.70 m100.0%
Activity total as printed: revised RM 1,699,800.00, spent RM 1,699,696.67 (JANM 2024, p. 114).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 1,901,500.00 | RM 1,487,300.00 | RM 1,487,292.73 | 100.0% | RM 7.27 | JANM 2024, p. 114 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 211,500.00 | RM 212,500.00 | RM 212,403.94 | 100.0% | RM 96.06 | JANM 2024, p. 114 |
040400Perbendaharaan Malaysia SabahRevised RM 4.75 mSpent RM 4.75 m100.0%
Activity total as printed: revised RM 4,746,400.00, spent RM 4,746,239.33 (JANM 2024, p. 114).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 2,551,300.00 | RM 2,838,400.00 | RM 2,838,339.90 | 100.0% | RM 60.10 | JANM 2024, p. 114 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 952,600.00 | RM 887,900.00 | RM 887,861.98 | 100.0% | RM 38.02 | JANM 2024, p. 114 |
| 30000 | AssetsAset | RM 0.00 | RM 49,400.00 | RM 49,392.40 | 100.0% | RM 7.60 | JANM 2024, p. 114 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 1,000,000.00 | RM 965,800.00 | RM 965,769.05 | 100.0% | RM 30.95 | JANM 2024, p. 114 |
| 50000 | Other ExpendituresPerbelanjaan-perbelanjaan Lain | RM 5,000.00 | RM 4,900.00 | RM 4,876.00 | 99.5% | RM 24.00 | JANM 2024, p. 114 |
040500Perbendaharaan Malaysia SarawakRevised RM 4.76 mSpent RM 4.76 m100.0%
Activity total as printed: revised RM 4,763,150.00, spent RM 4,762,945.04 (JANM 2024, p. 114).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 2,663,400.00 | RM 2,725,000.00 | RM 2,724,967.62 | 100.0% | RM 32.38 | JANM 2024, p. 114 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 964,000.00 | RM 905,200.00 | RM 905,160.49 | 100.0% | RM 39.51 | JANM 2024, p. 114 |
| 30000 | AssetsAset | RM 100,000.00 | RM 715,750.00 | RM 715,698.90 | 100.0% | RM 51.10 | JANM 2024, p. 114 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 425,500.00 | RM 417,200.00 | RM 417,118.03 | 100.0% | RM 81.97 | JANM 2024, p. 114 |
040600Penilaian dan Pekhidmatan HartaRevised RM 175.63 mSpent RM 175.63 m100.0%
Activity total as printed: revised RM 175,631,960.00, spent RM 175,631,882.14 (JANM 2024, p. 114).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 101,532,400.00 | RM 108,798,500.00 | RM 108,798,485.86 | 100.0% | RM 14.14 | JANM 2024, p. 114 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 54,235,300.00 | RM 58,772,938.00 | RM 58,772,929.89 | 100.0% | RM 8.11 | JANM 2024, p. 114 |
| 30000 | AssetsAset | RM 11,652,200.00 | RM 7,971,922.00 | RM 7,971,876.39 | 100.0% | RM 45.61 | JANM 2024, p. 114 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 87,000.00 | RM 88,600.00 | RM 88,590.00 | 100.0% | RM 10.00 | JANM 2024, p. 114 |
050000Perkhidmatan Perakaunan
050100Pembangunan Perakaunan dan PengurusanRevised RM 34.38 mSpent RM 34.38 m100.0%
Activity total as printed: revised RM 34,377,400.00, spent RM 34,377,328.76 (JANM 2024, p. 114).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 20,163,000.00 | RM 19,720,200.00 | RM 19,720,182.86 | 100.0% | RM 17.14 | JANM 2024, p. 114 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 17,120,700.00 | RM 12,640,000.00 | RM 12,639,981.07 | 100.0% | RM 18.93 | JANM 2024, p. 114 |
| 30000 | AssetsAset | RM 338,900.00 | RM 1,800,700.00 | RM 1,800,664.83 | 100.0% | RM 35.17 | JANM 2024, p. 114 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 251,600.00 | RM 216,500.00 | RM 216,500.00 | 100.0% | RM 0.00 | JANM 2024, p. 114 |
050200Pengurusan Wang Tak DituntutRevised RM 14.81 mSpent RM 14.81 m100.0%
Activity total as printed: revised RM 14,812,000.00, spent RM 14,811,879.61 (JANM 2024, p. 114).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 4,482,100.00 | RM 4,809,900.00 | RM 4,809,836.22 | 100.0% | RM 63.78 | JANM 2024, p. 114 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 13,623,400.00 | RM 9,248,700.00 | RM 9,248,654.19 | 100.0% | RM 45.81 | JANM 2024, p. 114 |
| 30000 | AssetsAset | RM 44,100.00 | RM 753,400.00 | RM 753,389.20 | 100.0% | RM 10.80 | JANM 2024, p. 114 |
050300Pengurusan Teknologi MaklumatRevised RM 58.70 mSpent RM 58.70 m100.0%
Activity total as printed: revised RM 58,700,800.00, spent RM 58,700,582.00 (JANM 2024, p. 114).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 12,550,300.00 | RM 12,185,600.00 | RM 12,185,514.82 | 100.0% | RM 85.18 | JANM 2024, p. 114 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 47,036,100.00 | RM 40,876,100.00 | RM 40,876,024.69 | 100.0% | RM 75.31 | JANM 2024, p. 114 |
| 30000 | AssetsAset | RM 3,499,000.00 | RM 5,639,100.00 | RM 5,639,042.49 | 100.0% | RM 57.51 | JANM 2024, p. 114 |
050400Pengurusan Operasi Pejabat PerakaunanRevised RM 104.13 mSpent RM 104.13 m100.0%
Activity total as printed: revised RM 104,130,500.00, spent RM 104,130,344.75 (JANM 2024, p. 114).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 82,615,600.00 | RM 89,459,700.00 | RM 89,459,633.28 | 100.0% | RM 66.72 | JANM 2024, p. 114 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 14,023,200.00 | RM 13,005,300.00 | RM 13,005,273.34 | 100.0% | RM 26.66 | JANM 2024, p. 114 |
| 30000 | AssetsAset | RM 200,000.00 | RM 1,665,500.00 | RM 1,665,438.13 | 100.0% | RM 61.87 | JANM 2024, p. 114 |
050500Perkhidmatan Operasi Pusat dan AgensiRevised RM 7.22 mSpent RM 7.22 m100.0%
Activity total as printed: revised RM 7,220,700.00, spent RM 7,220,590.33 (JANM 2024, p. 114).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 6,890,100.00 | RM 6,890,100.00 | RM 6,890,100.00 | 100.0% | RM 0.00 | JANM 2024, p. 114 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 313,600.00 | RM 310,800.00 | RM 310,780.33 | 100.0% | RM 19.67 | JANM 2024, p. 114 |
| 30000 | AssetsAset | RM 0.00 | RM 19,800.00 | RM 19,710.00 | 99.5% | RM 90.00 | JANM 2024, p. 114 |
050600Pengurusan Audit DalamRevised RM 9.59 mSpent RM 9.59 m100.0%
Activity total as printed: revised RM 9,590,800.00, spent RM 9,590,708.65 (JANM 2024, p. 115).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 9,062,200.00 | RM 8,898,100.00 | RM 8,898,072.82 | 100.0% | RM 27.18 | JANM 2024, p. 115 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 805,800.00 | RM 665,000.00 | RM 664,935.83 | 100.0% | RM 64.17 | JANM 2024, p. 115 |
| 30000 | AssetsAset | RM 0.00 | RM 27,700.00 | RM 27,700.00 | 100.0% | RM 0.00 | JANM 2024, p. 115 |
050700Khidmat PerundingRevised RM 22.26 mSpent RM 22.26 m100.0%
Activity total as printed: revised RM 22,256,900.00, spent RM 22,256,852.98 (JANM 2024, p. 115).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 4,922,200.00 | RM 5,269,000.00 | RM 5,268,995.51 | 100.0% | RM 4.49 | JANM 2024, p. 115 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 16,573,100.00 | RM 6,602,300.00 | RM 6,602,291.38 | 100.0% | RM 8.62 | JANM 2024, p. 115 |
| 30000 | AssetsAset | RM 1,726,800.00 | RM 10,385,600.00 | RM 10,385,566.09 | 100.0% | RM 33.91 | JANM 2024, p. 115 |
050800Pengurusan Perakaunan Kementerian KewanganRevised RM 4.92 mSpent RM 4.92 m100.0%
Activity total as printed: revised RM 4,921,300.00, spent RM 4,921,114.80 (JANM 2024, p. 115).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 4,636,200.00 | RM 4,524,200.00 | RM 4,524,109.80 | 100.0% | RM 90.20 | JANM 2024, p. 115 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 375,300.00 | RM 372,000.00 | RM 371,974.00 | 100.0% | RM 26.00 | JANM 2024, p. 115 |
| 30000 | AssetsAset | RM 15,000.00 | RM 25,100.00 | RM 25,031.00 | 99.7% | RM 69.00 | JANM 2024, p. 115 |
050900Institut Perakaunan Negara (IPN)Revised RM 19.27 mSpent RM 19.27 m100.0%
Activity total as printed: revised RM 19,265,700.00, spent RM 19,265,595.05 (JANM 2024, p. 115).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 5,838,200.00 | RM 6,485,100.00 | RM 6,485,036.80 | 100.0% | RM 63.20 | JANM 2024, p. 115 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 12,840,300.00 | RM 12,201,900.00 | RM 12,201,891.72 | 100.0% | RM 8.28 | JANM 2024, p. 115 |
| 30000 | AssetsAset | RM 2,354,000.00 | RM 578,700.00 | RM 578,666.53 | 100.0% | RM 33.47 | JANM 2024, p. 115 |
060000Program Khusus
060100Bertugas ke Luar NegaraRevised RM 11.56 mSpent RM 11.56 m100.0%
Activity total as printed: revised RM 11,560,400.00, spent RM 11,560,349.11 (JANM 2024, p. 115).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 10,000,000.00 | RM 11,560,400.00 | RM 11,560,349.11 | 100.0% | RM 50.89 | JANM 2024, p. 115 |
060200Emolumen Kakitangan KontrakRevised RM 16.61 mSpent RM 16.61 m100.0%
Activity total as printed: revised RM 16,614,600.00, spent RM 16,614,491.63 (JANM 2024, p. 115).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 1,502,300.00 | RM 1,074,100.00 | RM 1,074,072.55 | 100.0% | RM 27.45 | JANM 2024, p. 115 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 15,287,500.00 | RM 15,481,500.00 | RM 15,481,458.89 | 100.0% | RM 41.11 | JANM 2024, p. 115 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 157,800.00 | RM 59,000.00 | RM 58,960.19 | 99.9% | RM 39.81 | JANM 2024, p. 115 |
060300Sistem Maklumat Kastam (SMK)Revised RM 108.33 mSpent RM 108.33 m100.0%
Activity total as printed: revised RM 108,327,500.00, spent RM 108,327,432.00 (JANM 2024, p. 115).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 103,739,700.00 | RM 108,327,500.00 | RM 108,327,432.00 | 100.0% | RM 68.00 | JANM 2024, p. 115 |
060400Fi Agensi Lembaga Hasil Dalam Negeri (LHDN)Revised RM 2.10 bnSpent RM 2.10 bn100.0%
Activity total as printed: revised RM 2,100,000,000.00, spent RM 2,100,000,000.00 (JANM 2024, p. 115).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 2,000,000,000.00 | RM 2,100,000,000.00 | RM 2,100,000,000.00 | 100.0% | RM 0.00 | JANM 2024, p. 115 |
060500Pusat Transformasi Bandar (Urban Transformation Centre - UTC)Revised RM 35.90 mSpent RM 35.90 m100.0%
Activity total as printed: revised RM 35,903,600.00, spent RM 35,903,566.74 (JANM 2024, p. 115).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 31,135,100.00 | RM 25,777,000.00 | RM 25,776,986.74 | 100.0% | RM 13.26 | JANM 2024, p. 115 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 5,871,000.00 | RM 10,126,600.00 | RM 10,126,580.00 | 100.0% | RM 20.00 | JANM 2024, p. 115 |
060600Mesin Pengimbas JKDMRevised RM 37.17 mSpent RM 37.17 m100.0%
Activity total as printed: revised RM 37,169,500.00, spent RM 37,169,440.43 (JANM 2024, p. 115).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 52,854,000.00 | RM 37,169,500.00 | RM 37,169,440.43 | 100.0% | RM 59.57 | JANM 2024, p. 115 |
Source: Jabatan Akauntan Negara, Penyata Kewangan Kerajaan Persekutuan 2024, Statement of Operating Expenditure (Lampiran 1). % used and unspent are worked out from the printed columns.