Kementerian Pengangkutan
A supply (B) vote: the operating spending Parliament voted for this ministry. What it was given and what it spent in 2018, by programme and activity, from the audited Statement of Operating Expenditure.
By programme
Each programme's totals as the statement prints them. Hover a figure for the exact amount, or open an activity below for every line to the sen.
| CodeKod | ProgrammeProgram | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 010000 | Perkhidmatan Pengangkutan | RM 1.02 bn | RM 1.01 bn | RM 1.00 bn | 99.2% | RM 7.74 m | JANM 2018, p. 143 |
| 020000 | Pengurusan Kementerian | RM 80.07 m | RM 68.61 m | RM 66.35 m | 96.7% | RM 2.25 m | JANM 2018, p. 144 |
| 030000 | Program Khusus | RM 217.58 m | RM 216.18 m | RM 215.35 m | 99.6% | RM 833,694.98 | JANM 2018, p. 144 |
| 040000 | Dasar Baru | RM 180.07 m | RM 169.86 m | RM 169.34 m | 99.7% | RM 521,854.30 | JANM 2018, p. 145 |
| 050000 | "one-off" | RM 12.33 m | RM 3.56 m | RM 3.09 m | 86.8% | RM 471,891.71 | JANM 2018, p. 145 |
| 060000 | Pembangunan Nasional | RM 0.00 | RM 48.47 m | RM 47.47 m | 97.9% | RM 1.01 m | JANM 2018, p. 145 |
Every activity, line by line
Open an activity to see its spending categories exactly as printed, to the sen, each with the page it was read from.
The 2018 statement prints the original budget, the revised budget and actual spending only, with no supplementary or virement columns.
010000Perkhidmatan Pengangkutan
010100Ibu Pejabat, Jabatan Penerbangan Awam (DCA)Revised RM 138.02 mSpent RM 137.62 m99.7%
Activity total as printed: revised RM 138,024,198.00, spent RM 137,620,592.48 (JANM 2018, p. 140).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 70,181,400.00 | RM 76,230,200.00 | RM 76,184,931.69 | 99.9% | RM 45,268.31 | JANM 2018, p. 140 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 63,653,200.00 | RM 58,181,107.00 | RM 57,854,679.17 | 99.4% | RM 326,427.83 | JANM 2018, p. 140 |
| 30000 | AssetsAset | RM 2,890,000.00 | RM 505,130.00 | RM 484,195.10 | 95.9% | RM 20,934.90 | JANM 2018, p. 140 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 2,473,900.00 | RM 3,013,700.00 | RM 3,002,725.77 | 99.6% | RM 10,974.23 | JANM 2018, p. 140 |
| 50000 | Other ExpendituresPerbelanjaan-perbelanjaan Lain | RM 125,000.00 | RM 94,061.00 | RM 94,060.75 | 100.0% | RM 0.25 | JANM 2018, p. 140 |
010200Trafik Udara SemenanjungRevised RM 117.53 mSpent RM 116.45 m99.1%
Activity total as printed: revised RM 117,527,033.00, spent RM 116,448,897.34 (JANM 2018, p. 140).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 16,277,100.00 | RM 14,277,100.00 | RM 14,121,714.03 | 98.9% | RM 155,385.97 | JANM 2018, p. 140 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 114,593,500.00 | RM 103,249,933.00 | RM 102,327,183.31 | 99.1% | RM 922,749.69 | JANM 2018, p. 140 |
010300Trafik Udara SabahRevised RM 19.54 mSpent RM 19.53 m100.0%
Activity total as printed: revised RM 19,537,450.00, spent RM 19,533,579.98 (JANM 2018, p. 140).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 14,638,400.00 | RM 14,464,400.00 | RM 14,460,877.15 | 100.0% | RM 3,522.85 | JANM 2018, p. 140 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 5,388,000.00 | RM 5,073,050.00 | RM 5,072,702.83 | 100.0% | RM 347.17 | JANM 2018, p. 140 |
010400Trafik Udara SarawakRevised RM 21.87 mSpent RM 21.10 m96.5%
Activity total as printed: revised RM 21,870,118.00, spent RM 21,097,348.59 (JANM 2018, p. 140).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 17,650,200.00 | RM 17,643,200.00 | RM 16,870,997.07 | 95.6% | RM 772,202.93 | JANM 2018, p. 140 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 4,760,200.00 | RM 4,225,918.00 | RM 4,225,352.62 | 100.0% | RM 565.38 | JANM 2018, p. 140 |
| 30000 | AssetsAset | RM 1,000.00 | RM 1,000.00 | RM 998.90 | 99.9% | RM 1.10 | JANM 2018, p. 140 |
010500Hal Ehwal Pelaut dan Pelabuhan, Jabatan Laut SemenanjungRevised RM 15.01 mSpent RM 14.96 m99.7%
Activity total as printed: revised RM 15,008,655.00, spent RM 14,959,860.96 (JANM 2018, p. 140).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 13,720,500.00 | RM 12,449,222.00 | RM 12,420,219.73 | 99.8% | RM 29,002.27 | JANM 2018, p. 140 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 3,814,500.00 | RM 2,559,433.00 | RM 2,539,641.23 | 99.2% | RM 19,791.77 | JANM 2018, p. 140 |
010600Hal Ehwal Pelaut dan Pelabuhan, Jabatan Laut SabahRevised RM 1.68 mSpent RM 1.68 m99.7%
Activity total as printed: revised RM 1,683,870.00, spent RM 1,678,137.62 (JANM 2018, p. 140).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 1,375,400.00 | RM 1,375,400.00 | RM 1,369,668.20 | 99.6% | RM 5,731.80 | JANM 2018, p. 140 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 466,000.00 | RM 308,470.00 | RM 308,469.42 | 100.0% | RM 0.58 | JANM 2018, p. 140 |
010700Hal Ehwal Pelaut dan Pelabuhan, Jabatan Laut SarawakRevised RM 7.94 mSpent RM 7.93 m99.9%
Activity total as printed: revised RM 7,935,456.00, spent RM 7,926,640.88 (JANM 2018, p. 141).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 8,523,200.00 | RM 6,395,724.00 | RM 6,395,723.57 | 100.0% | RM 0.43 | JANM 2018, p. 141 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 2,640,600.00 | RM 1,539,732.00 | RM 1,530,917.31 | 99.4% | RM 8,814.69 | JANM 2018, p. 141 |
010800Kawalan Industri, Jabatan Laut SemenanjungRevised RM 13.19 mSpent RM 13.07 m99.2%
Activity total as printed: revised RM 13,187,050.00, spent RM 13,074,943.43 (JANM 2018, p. 141).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 12,971,600.00 | RM 11,971,600.00 | RM 11,950,804.70 | 99.8% | RM 20,795.30 | JANM 2018, p. 141 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 2,052,800.00 | RM 1,147,070.00 | RM 1,057,520.39 | 92.2% | RM 89,549.61 | JANM 2018, p. 141 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 70,000.00 | RM 68,380.00 | RM 66,618.34 | 97.4% | RM 1,761.66 | JANM 2018, p. 141 |
010900Kawalan Industri, Jabatan Laut SabahRevised RM 2.05 mSpent RM 1.60 m78.0%
Activity total as printed: revised RM 2,052,929.00, spent RM 1,600,600.21 (JANM 2018, p. 141).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 1,858,100.00 | RM 1,863,101.00 | RM 1,410,772.50 | 75.7% | RM 452,328.50 | JANM 2018, p. 141 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 306,700.00 | RM 189,828.00 | RM 189,827.71 | 100.0% | RM 0.29 | JANM 2018, p. 141 |
011000Kawalan Industri, Jabatan Laut SarawakRevised RM 3.41 mSpent RM 3.37 m99.0%
Activity total as printed: revised RM 3,408,424.00, spent RM 3,373,217.34 (JANM 2018, p. 141).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 3,202,400.00 | RM 2,768,735.00 | RM 2,742,216.94 | 99.0% | RM 26,518.06 | JANM 2018, p. 141 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 1,037,800.00 | RM 639,689.00 | RM 631,000.40 | 98.6% | RM 8,688.60 | JANM 2018, p. 141 |
011100Keselamatan Pelayaran, Jabatan Laut SemenanjungRevised RM 22.77 mSpent RM 21.73 m95.4%
Activity total as printed: revised RM 22,772,831.00, spent RM 21,732,310.86 (JANM 2018, p. 141).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 9,944,800.00 | RM 9,944,800.00 | RM 8,973,921.16 | 90.2% | RM 970,878.84 | JANM 2018, p. 141 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 13,798,800.00 | RM 12,828,031.00 | RM 12,758,389.70 | 99.5% | RM 69,641.30 | JANM 2018, p. 141 |
011200Keselamatan Pelayaran, Jabatan Laut SabahRevised RM 6.99 mSpent RM 6.91 m98.9%
Activity total as printed: revised RM 6,986,746.00, spent RM 6,912,615.02 (JANM 2018, p. 141).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 4,859,300.00 | RM 4,859,300.00 | RM 4,785,171.04 | 98.5% | RM 74,128.96 | JANM 2018, p. 141 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 4,112,300.00 | RM 2,127,446.00 | RM 2,127,443.98 | 100.0% | RM 2.02 | JANM 2018, p. 141 |
011300Keselamatan Pelayaran, Jabatan Laut SarawakRevised RM 4.14 mSpent RM 4.10 m99.1%
Activity total as printed: revised RM 4,140,576.00, spent RM 4,103,752.50 (JANM 2018, p. 141).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 4,729,600.00 | RM 3,521,792.00 | RM 3,521,791.48 | 100.0% | RM 0.52 | JANM 2018, p. 141 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 758,100.00 | RM 618,784.00 | RM 581,961.02 | 94.0% | RM 36,822.98 | JANM 2018, p. 141 |
011400Khidmat Pengurusan, Jabatan Laut SemenanjungRevised RM 31.27 mSpent RM 30.87 m98.7%
Activity total as printed: revised RM 31,271,621.00, spent RM 30,874,058.35 (JANM 2018, p. 141).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 8,867,900.00 | RM 8,720,523.00 | RM 8,543,900.59 | 98.0% | RM 176,622.41 | JANM 2018, p. 141 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 23,772,900.00 | RM 22,467,182.00 | RM 22,247,342.72 | 99.0% | RM 219,839.28 | JANM 2018, p. 141 |
| 30000 | AssetsAset | RM 3,323,000.00 | RM 58,296.00 | RM 58,296.00 | 100.0% | RM 0.00 | JANM 2018, p. 141 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 15,000.00 | RM 25,620.00 | RM 24,519.04 | 95.7% | RM 1,100.96 | JANM 2018, p. 141 |
011500Perkihdmatan Bantuan, Jabatan Laut SabahRevised RM 3.50 mSpent RM 3.49 m99.7%
Activity total as printed: revised RM 3,501,649.00, spent RM 3,489,560.38 (JANM 2018, p. 141).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 1,355,500.00 | RM 1,369,500.00 | RM 1,369,041.90 | 100.0% | RM 458.10 | JANM 2018, p. 141 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 2,480,500.00 | RM 2,120,199.00 | RM 2,111,233.48 | 99.6% | RM 8,965.52 | JANM 2018, p. 141 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 12,000.00 | RM 10,000.00 | RM 9,180.00 | 91.8% | RM 820.00 | JANM 2018, p. 141 |
| 50000 | Other ExpendituresPerbelanjaan-perbelanjaan Lain | RM 7,800.00 | RM 1,950.00 | RM 105.00 | 5.4% | RM 1,845.00 | JANM 2018, p. 141 |
011600Pentadbiran Am, Jabatan Laut SarawakRevised RM 12.38 mSpent RM 12.19 m98.5%
Activity total as printed: revised RM 12,383,170.00, spent RM 12,192,038.83 (JANM 2018, p. 141).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 7,165,100.00 | RM 7,425,100.00 | RM 7,423,755.28 | 100.0% | RM 1,344.72 | JANM 2018, p. 141 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 5,445,700.00 | RM 4,941,210.00 | RM 4,760,163.55 | 96.3% | RM 181,046.45 | JANM 2018, p. 141 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 27,600.00 | RM 16,860.00 | RM 8,120.00 | 48.2% | RM 8,740.00 | JANM 2018, p. 141 |
011700Institut Latihan Pentadbiran dan Pengurusan Pengangkutan LautRevised RM 4.54 mSpent RM 4.30 m94.6%
Activity total as printed: revised RM 4,543,340.00, spent RM 4,299,255.00 (JANM 2018, p. 141).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 2,238,100.00 | RM 2,238,100.00 | RM 2,068,819.13 | 92.4% | RM 169,280.87 | JANM 2018, p. 141 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 3,862,200.00 | RM 2,305,240.00 | RM 2,230,435.87 | 96.8% | RM 74,804.13 | JANM 2018, p. 141 |
011800Pendaftaran dan Pelesenan Kenderaan Motor, Jabatan Pengangkutan Jalan (JPJ)Revised RM 54.40 mSpent RM 53.75 m98.8%
Activity total as printed: revised RM 54,402,500.00, spent RM 53,754,424.86 (JANM 2018, p. 142).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 32,039,500.00 | RM 26,459,500.00 | RM 25,841,127.09 | 97.7% | RM 618,372.91 | JANM 2018, p. 142 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 31,040,000.00 | RM 27,943,000.00 | RM 27,913,297.77 | 99.9% | RM 29,702.23 | JANM 2018, p. 142 |
011900Penguatkuasaan Undang-undang, JPJRevised RM 183.08 mSpent RM 182.87 m99.9%
Activity total as printed: revised RM 183,078,460.00, spent RM 182,873,150.89 (JANM 2018, p. 142).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 157,633,900.00 | RM 169,433,900.00 | RM 169,391,360.33 | 100.0% | RM 42,539.67 | JANM 2018, p. 142 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 12,800,000.00 | RM 13,343,560.00 | RM 13,204,048.21 | 99.0% | RM 139,511.79 | JANM 2018, p. 142 |
| 30000 | AssetsAset | RM 1,000.00 | RM 301,000.00 | RM 277,742.35 | 92.3% | RM 23,257.65 | JANM 2018, p. 142 |
012000Perkhidmatan Teknikal, JPJRevised RM 4.64 mSpent RM 4.63 m99.8%
Activity total as printed: revised RM 4,637,400.00, spent RM 4,628,761.67 (JANM 2018, p. 142).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 4,104,900.00 | RM 4,524,900.00 | RM 4,521,905.21 | 99.9% | RM 2,994.79 | JANM 2018, p. 142 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 140,000.00 | RM 112,500.00 | RM 106,856.46 | 95.0% | RM 5,643.54 | JANM 2018, p. 142 |
012100Pengujian dan Pelesenan Pemandu, JPJRevised RM 65.86 mSpent RM 65.43 m99.3%
Activity total as printed: revised RM 65,858,089.00, spent RM 65,428,246.34 (JANM 2018, p. 142).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 28,974,400.00 | RM 23,554,400.00 | RM 23,175,001.93 | 98.4% | RM 379,398.07 | JANM 2018, p. 142 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 34,360,000.00 | RM 42,303,689.00 | RM 42,253,244.41 | 99.9% | RM 50,444.59 | JANM 2018, p. 142 |
012200Pengurusan Pejabat, JPJRevised RM 129.70 mSpent RM 129.64 m100.0%
Activity total as printed: revised RM 129,702,086.00, spent RM 129,643,433.73 (JANM 2018, p. 142).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 52,807,700.00 | RM 57,812,220.00 | RM 57,803,378.40 | 100.0% | RM 8,841.60 | JANM 2018, p. 142 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 54,434,800.00 | RM 71,447,216.00 | RM 71,429,287.24 | 100.0% | RM 17,928.76 | JANM 2018, p. 142 |
| 30000 | AssetsAset | RM 0.00 | RM 360,650.00 | RM 345,814.60 | 95.9% | RM 14,835.40 | JANM 2018, p. 142 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 70,000.00 | RM 82,000.00 | RM 64,953.49 | 79.2% | RM 17,046.51 | JANM 2018, p. 142 |
012300Kewangan, Akaun dan Hasil, JPJRevised RM 11.30 mSpent RM 11.22 m99.3%
Activity total as printed: revised RM 11,296,400.00, spent RM 11,216,547.92 (JANM 2018, p. 142).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 3,797,800.00 | RM 4,076,800.00 | RM 4,076,662.37 | 100.0% | RM 137.63 | JANM 2018, p. 142 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 8,085,100.00 | RM 7,219,600.00 | RM 7,139,885.55 | 98.9% | RM 79,714.45 | JANM 2018, p. 142 |
012400Korporat dan Perancangan Strategik, JPJRevised RM 1.63 mSpent RM 1.57 m96.4%
Activity total as printed: revised RM 1,627,600.00, spent RM 1,568,705.90 (JANM 2018, p. 142).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 1,373,100.00 | RM 1,373,100.00 | RM 1,330,626.21 | 96.9% | RM 42,473.79 | JANM 2018, p. 142 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 346,000.00 | RM 254,500.00 | RM 238,079.69 | 93.5% | RM 16,420.31 | JANM 2018, p. 142 |
012500Teknologi Maklumat, JPJRevised RM 40.97 mSpent RM 40.77 m99.5%
Activity total as printed: revised RM 40,974,581.00, spent RM 40,771,983.40 (JANM 2018, p. 142).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 8,488,800.00 | RM 8,488,800.00 | RM 8,342,766.45 | 98.3% | RM 146,033.55 | JANM 2018, p. 142 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 29,153,300.00 | RM 32,485,781.00 | RM 32,429,216.95 | 99.8% | RM 56,564.05 | JANM 2018, p. 142 |
012600Pengurusan Integriti, JPJRevised RM 2.20 mSpent RM 2.20 m99.8%
Activity total as printed: revised RM 2,203,200.00, spent RM 2,199,983.62 (JANM 2018, p. 142).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 2,061,200.00 | RM 2,135,200.00 | RM 2,134,595.19 | 100.0% | RM 604.81 | JANM 2018, p. 142 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 80,000.00 | RM 68,000.00 | RM 65,388.43 | 96.2% | RM 2,611.57 | JANM 2018, p. 142 |
012700Pengangkutan Jalan SabahRevised RM 37.46 mSpent RM 37.41 m99.9%
Activity total as printed: revised RM 37,458,650.00, spent RM 37,414,463.64 (JANM 2018, p. 142).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 29,823,000.00 | RM 31,073,000.00 | RM 31,072,906.39 | 100.0% | RM 93.61 | JANM 2018, p. 142 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 7,652,000.00 | RM 6,385,650.00 | RM 6,341,557.25 | 99.3% | RM 44,092.75 | JANM 2018, p. 142 |
012800Pengangkutan Jalan SarawakRevised RM 35.57 mSpent RM 35.43 m99.6%
Activity total as printed: revised RM 35,565,200.00, spent RM 35,433,416.29 (JANM 2018, p. 142).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 30,523,700.00 | RM 31,128,700.00 | RM 31,126,635.93 | 100.0% | RM 2,064.07 | JANM 2018, p. 142 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 4,872,000.00 | RM 4,436,500.00 | RM 4,306,780.36 | 97.1% | RM 129,719.64 | JANM 2018, p. 142 |
012900Pengangkutan Jalan LabuanRevised RM 2.75 mSpent RM 2.56 m93.0%
Activity total as printed: revised RM 2,753,700.00, spent RM 2,560,254.28 (JANM 2018, p. 142).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 2,350,600.00 | RM 2,350,600.00 | RM 2,157,213.90 | 91.8% | RM 193,386.10 | JANM 2018, p. 142 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 447,500.00 | RM 403,100.00 | RM 403,040.38 | 100.0% | RM 59.62 | JANM 2018, p. 142 |
013000Jabatan Keselamatan Jalan RayaRevised RM 15.70 mSpent RM 14.94 m95.2%
Activity total as printed: revised RM 15,704,225.00, spent RM 14,942,424.60 (JANM 2018, p. 143).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 8,398,800.00 | RM 8,398,800.00 | RM 7,959,772.50 | 94.8% | RM 439,027.50 | JANM 2018, p. 143 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 7,714,500.00 | RM 7,305,425.00 | RM 6,982,652.10 | 95.6% | RM 322,772.90 | JANM 2018, p. 143 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 6,200.00 | RM 0.00 | RM 0.00 | 0.0% | RM 0.00 | JANM 2018, p. 143 |
020000Pengurusan Kementerian
020100MaritimRevised RM 4.65 mSpent RM 4.57 m98.3%
Activity total as printed: revised RM 4,647,010.00, spent RM 4,568,508.02 (JANM 2018, p. 143).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 2,707,500.00 | RM 2,707,500.00 | RM 2,692,233.56 | 99.4% | RM 15,266.44 | JANM 2018, p. 143 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 1,191,500.00 | RM 906,350.00 | RM 851,825.94 | 94.0% | RM 54,524.06 | JANM 2018, p. 143 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 1,500,000.00 | RM 1,015,960.00 | RM 1,015,848.71 | 100.0% | RM 111.29 | JANM 2018, p. 143 |
| 50000 | Other ExpendituresPerbelanjaan-perbelanjaan Lain | RM 17,200.00 | RM 17,200.00 | RM 8,599.81 | 50.0% | RM 8,600.19 | JANM 2018, p. 143 |
020200UdaraRevised RM 3.79 mSpent RM 3.62 m95.4%
Activity total as printed: revised RM 3,789,887.00, spent RM 3,615,378.32 (JANM 2018, p. 143).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 2,372,300.00 | RM 2,133,780.00 | RM 1,981,626.43 | 92.9% | RM 152,153.57 | JANM 2018, p. 143 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 1,864,500.00 | RM 1,656,107.00 | RM 1,633,751.89 | 98.7% | RM 22,355.11 | JANM 2018, p. 143 |
020300Logistik dan DaratRevised RM 10.36 mSpent RM 10.03 m96.8%
Activity total as printed: revised RM 10,363,761.00, spent RM 10,031,378.89 (JANM 2018, p. 143).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 2,628,400.00 | RM 2,628,400.00 | RM 2,403,737.93 | 91.5% | RM 224,662.07 | JANM 2018, p. 143 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 22,916,000.00 | RM 7,735,361.00 | RM 7,627,640.96 | 98.6% | RM 107,720.04 | JANM 2018, p. 143 |
020400Perancangan Strategik dan AntarabangsaRevised RM 2.66 mSpent RM 2.55 m96.1%
Activity total as printed: revised RM 2,655,350.00, spent RM 2,550,914.67 (JANM 2018, p. 143).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 2,425,300.00 | RM 2,425,300.00 | RM 2,351,286.92 | 97.0% | RM 74,013.08 | JANM 2018, p. 143 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 314,500.00 | RM 230,050.00 | RM 199,627.75 | 86.8% | RM 30,422.25 | JANM 2018, p. 143 |
020500Pengurusan Sumber ManusiaRevised RM 2.33 mSpent RM 2.20 m94.5%
Activity total as printed: revised RM 2,327,460.00, spent RM 2,200,404.36 (JANM 2018, p. 143).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 2,026,700.00 | RM 2,026,700.00 | RM 1,965,213.54 | 97.0% | RM 61,486.46 | JANM 2018, p. 143 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 206,400.00 | RM 123,760.00 | RM 119,831.01 | 96.8% | RM 3,928.99 | JANM 2018, p. 143 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 177,000.00 | RM 177,000.00 | RM 115,359.81 | 65.2% | RM 61,640.19 | JANM 2018, p. 143 |
020600Pengurusan MaklumatRevised RM 2.38 mSpent RM 2.33 m97.8%
Activity total as printed: revised RM 2,384,760.00, spent RM 2,333,487.07 (JANM 2018, p. 143).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 798,600.00 | RM 798,600.00 | RM 756,930.12 | 94.8% | RM 41,669.88 | JANM 2018, p. 143 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 2,585,500.00 | RM 1,586,160.00 | RM 1,576,556.95 | 99.4% | RM 9,603.05 | JANM 2018, p. 143 |
020700Pentadbiran dan KewanganRevised RM 35.71 mSpent RM 34.44 m96.4%
Activity total as printed: revised RM 35,709,485.00, spent RM 34,439,911.56 (JANM 2018, p. 143).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 12,614,000.00 | RM 12,466,163.00 | RM 11,614,672.54 | 93.2% | RM 851,490.46 | JANM 2018, p. 143 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 16,455,700.00 | RM 15,095,436.00 | RM 14,752,621.52 | 97.7% | RM 342,814.48 | JANM 2018, p. 143 |
| 30000 | AssetsAset | RM 0.00 | RM 247,896.00 | RM 247,887.50 | 100.0% | RM 8.50 | JANM 2018, p. 143 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 9,000.00 | RM 7,899,990.00 | RM 7,824,730.00 | 99.0% | RM 75,260.00 | JANM 2018, p. 143 |
020800AkaunRevised RM 4.15 mSpent RM 4.10 m98.7%
Activity total as printed: revised RM 4,154,099.00, spent RM 4,098,483.33 (JANM 2018, p. 143).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 3,565,000.00 | RM 3,263,003.00 | RM 3,214,695.81 | 98.5% | RM 48,307.19 | JANM 2018, p. 143 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 1,043,600.00 | RM 891,096.00 | RM 883,787.52 | 99.2% | RM 7,308.48 | JANM 2018, p. 143 |
020900PembangunanRevised RM 2.58 mSpent RM 2.51 m97.6%
Activity total as printed: revised RM 2,576,020.00, spent RM 2,514,777.59 (JANM 2018, p. 143).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 2,377,800.00 | RM 2,377,800.00 | RM 2,337,931.17 | 98.3% | RM 39,868.83 | JANM 2018, p. 143 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 275,800.00 | RM 198,220.00 | RM 176,846.42 | 89.2% | RM 21,373.58 | JANM 2018, p. 143 |
030000Program Khusus
030100Bertugas ke Luar NegaraRevised RM 3.96 mSpent RM 3.16 m79.8%
Activity total as printed: revised RM 3,957,705.00, spent RM 3,159,551.95 (JANM 2018, p. 144).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 3,615,300.00 | RM 3,957,705.00 | RM 3,159,551.95 | 79.8% | RM 798,153.05 | JANM 2018, p. 144 |
030200Emolumen Kakitangan KontrakRevised RM 1.37 mSpent RM 1.34 m97.7%
Activity total as printed: revised RM 1,367,273.00, spent RM 1,336,324.57 (JANM 2018, p. 144).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 1,500,000.00 | RM 1,367,273.00 | RM 1,336,324.57 | 97.7% | RM 30,948.43 | JANM 2018, p. 144 |
030300Subsidi Perkhidmatan Udara Luar Bandar (RAS)Revised RM 160.00 mSpent RM 160.00 m100.0%
Activity total as printed: revised RM 160,000,000.00, spent RM 160,000,000.00 (JANM 2018, p. 144).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 160,000,000.00 | RM 160,000,000.00 | RM 160,000,000.00 | 100.0% | RM 0.00 | JANM 2018, p. 144 |
030400Subsidi Tren Tidak Ekonomik, Keretapi Tanah Melayu Berhad (KTMB)Revised RM 25.00 mSpent RM 25.00 m100.0%
Activity total as printed: revised RM 25,000,000.00, spent RM 25,000,000.00 (JANM 2018, p. 144).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 25,000,000.00 | RM 25,000,000.00 | RM 25,000,000.00 | 100.0% | RM 0.00 | JANM 2018, p. 144 |
030500Lintasan Rata Awam (KTMB)Revised RM 5.57 mSpent RM 5.57 m100.0%
Activity total as printed: revised RM 5,567,288.00, spent RM 5,567,287.50 (JANM 2018, p. 144).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 6,236,000.00 | RM 5,567,288.00 | RM 5,567,287.50 | 100.0% | RM 0.50 | JANM 2018, p. 144 |
030600Kempen Multimedia Keselamatan Jalan Raya (JKR)Revised RM 0.00Spent RM 0.000.0%
Activity total as printed: revised RM 0.00, spent RM 0.00 (JANM 2018, p. 144).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 1,000,000.00 | RM 0.00 | RM 0.00 | 0.0% | RM 0.00 | JANM 2018, p. 144 |
030700Pemberian Kepada MKJR (JKJR)Revised RM 1.06 mSpent RM 1.06 m100.0%
Activity total as printed: revised RM 1,057,896.00, spent RM 1,057,896.00 (JANM 2018, p. 144).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 1,000,000.00 | RM 1,057,896.00 | RM 1,057,896.00 | 100.0% | RM 0.00 | JANM 2018, p. 144 |
030800Institut Hal Ehwal Mritim (MIMA)Revised RM 3.50 mSpent RM 3.50 m100.0%
Activity total as printed: revised RM 3,500,300.00, spent RM 3,500,300.00 (JANM 2018, p. 144).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 3,500,300.00 | RM 3,500,300.00 | RM 3,500,300.00 | 100.0% | RM 0.00 | JANM 2018, p. 144 |
030900Malaysian Institute of Road Safety Research (MIROS)Revised RM 15.73 mSpent RM 15.73 m100.0%
Activity total as printed: revised RM 15,729,200.00, spent RM 15,729,200.00 (JANM 2018, p. 144).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 15,729,200.00 | RM 15,729,200.00 | RM 15,729,200.00 | 100.0% | RM 0.00 | JANM 2018, p. 144 |
031000Bertugas Ke Luar Negara - Lembaga Pelesenan Kenderaan Perdagangan Sabah dan SarawakRevised RM 4,593.00Spent RM 0.000.0%
Activity total as printed: revised RM 4,593.00, spent RM 0.00 (JANM 2018, p. 144).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 0.00 | RM 4,593.00 | RM 0.00 | 0.0% | RM 4,593.00 | JANM 2018, p. 144 |
040000Dasar Baru
040100Perkhidmatan PengangkutanRevised RM 59.06 mSpent RM 58.54 m99.1%
Activity total as printed: revised RM 59,061,667.00, spent RM 58,539,813.24 (JANM 2018, p. 144).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 65,377,000.00 | RM 59,061,667.00 | RM 58,539,813.24 | 99.1% | RM 521,853.76 | JANM 2018, p. 144 |
040200Pengurusan KementerianRevised RM 110.80 mSpent RM 110.80 m100.0%
Activity total as printed: revised RM 110,798,281.00, spent RM 110,798,280.46 (JANM 2018, p. 144).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 54,200,600.00 | RM 75,775,336.00 | RM 75,775,335.94 | 100.0% | RM 0.06 | JANM 2018, p. 144 |
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 60,492,900.00 | RM 35,022,945.00 | RM 35,022,944.52 | 100.0% | RM 0.48 | JANM 2018, p. 144 |
050000"one-off"
050100Perkhidmatan PengangkutanRevised RM 2.78 mSpent RM 2.48 m89.4%
Activity total as printed: revised RM 2,777,800.00, spent RM 2,483,045.14 (JANM 2018, p. 145).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 0.00 | RM 80,800.00 | RM 5,386.53 | 6.7% | RM 75,413.47 | JANM 2018, p. 145 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 11,427,000.00 | RM 911,080.00 | RM 719,572.47 | 79.0% | RM 191,507.53 | JANM 2018, p. 145 |
| 30000 | AssetsAset | RM 405,000.00 | RM 1,785,920.00 | RM 1,758,086.14 | 98.4% | RM 27,833.86 | JANM 2018, p. 145 |
050200Pengurusan KementerianRevised RM 502,500.00Spent RM 502,500.00100.0%
Activity total as printed: revised RM 502,500.00, spent RM 502,500.00 (JANM 2018, p. 145).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 502,500.00 | RM 502,500.00 | RM 502,500.00 | 100.0% | RM 0.00 | JANM 2018, p. 145 |
050300Perolehan Kenderaan - Lembaga Pelesenan Kenderaan Perdagangan Sabah dan SarawakRevised RM 280,000.00Spent RM 102,863.1536.7%
Activity total as printed: revised RM 280,000.00, spent RM 102,863.15 (JANM 2018, p. 145).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 30000 | AssetsAset | RM 0.00 | RM 280,000.00 | RM 102,863.15 | 36.7% | RM 177,136.85 | JANM 2018, p. 145 |
060000Pembangunan Nasional
060100Suruhanjaya Pengangkutan Awam Darat (SPAD)Revised RM 43.87 mSpent RM 43.87 m100.0%
Activity total as printed: revised RM 43,867,148.00, spent RM 43,867,148.00 (JANM 2018, p. 145).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 40000 | Grants and Fixed ChargesPemberian dan Kenaan Bayaran Tetap | RM 0.00 | RM 43,867,148.00 | RM 43,867,148.00 | 100.0% | RM 0.00 | JANM 2018, p. 145 |
060200Lembaga Pelesenan Kenderaan Perdagangan SabahRevised RM 2.64 mSpent RM 2.13 m80.5%
Activity total as printed: revised RM 2,642,109.00, spent RM 2,128,030.17 (JANM 2018, p. 145).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 0.00 | RM 1,756,183.00 | RM 1,473,239.89 | 83.9% | RM 282,943.11 | JANM 2018, p. 145 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 0.00 | RM 885,926.00 | RM 654,790.28 | 73.9% | RM 231,135.72 | JANM 2018, p. 145 |
060300Lembaga Pelesenan Kenderaan Perdagangan SarawakRevised RM 1.96 mSpent RM 1.47 m75.0%
Activity total as printed: revised RM 1,962,863.00, spent RM 1,471,548.32 (JANM 2018, p. 145).
| CodeKod | Spending categoryMaksud Perbelanjaan | Original budgetAsal | Revised budgetJumlah | SpentSebenar | % usedPrestasi | UnspentVarian | SourceSumber |
|---|---|---|---|---|---|---|---|
| 10000 | EmolumentsEmolumen | RM 0.00 | RM 1,641,554.00 | RM 1,217,483.90 | 74.2% | RM 424,070.10 | JANM 2018, p. 145 |
| 20000 | Supplies and ServicesPerkhidmatan dan Bekalan | RM 0.00 | RM 321,309.00 | RM 254,064.42 | 79.1% | RM 67,244.58 | JANM 2018, p. 145 |
Source: Jabatan Akauntan Negara, Penyata Kewangan Kerajaan Persekutuan 2018, Statement of Operating Expenditure (Lampiran 1). % used and unspent are worked out from the printed columns.